4.Attach the Frame (9) to the Upright (2) with two M8 x 80mm Bolts (100), two M8 Washers (103), and two M8 Nylon Locknuts (78). Do not tighten the Nylon Locknuts yet.
Attach the Frame (9) to the Front Leg (10) with two M8 x 65mm Bolts (101), two M8 Washers (103), and two M8 Nylon Locknuts (78). Do not tighten the Nylon Locknuts yet.
5.Attach the bottom of the Left Shroud (21) to the Base (1) with two M4 x 12mm
Repeat this step for the Right Shroud (not shown).
6.Note: Some parts are not shown to show this step clearly.
Slide the two Weight Bumpers (71) onto the Weight Guides (18). Orient nine Weights (19) with the pin holes on the bottom as shown. Slide the Weights onto the Weight Guides.
Insert the Weight Selector (20) into the nine Weights (19). Make sure that the pin on the
Weight Selector is oriented as shown.
Lubricate the indicated holes in a Weight (19) with the included grease packet. Slide the Weight onto the Weight Guides (18).
4 | 78 | 2 |
| ||
| 9 | 100 |
| 78 | |
| 103 | |
|
| 78 |
| 78 | 100 |
|
| |
|
| 103 |
103 | 10 |
|
|
| |
101 |
|
|
5 |
|
|
1 |
21 |
102 |
6 |
18 |
Grease |
19 |
Pin |
20 |
Pin |
Hole |
19 |
71 |
10