7. Attach the Top Frame (4) to the Upright (2) with |
two M8 x 80mm Bolts (100), two M8 Washers |
(103), and two M8 Nylon Locknuts (78). Do not |
tighten the Nylon Locknuts yet. |
Attach the Weight Guides (18) to the Top Frame |
7
100
96
80
(4) with two M10 x 20mm Button Screws (96) and |
two M10 Washers (80). |
103
4
18
78
78
2
8.Attach the top of the Left Shroud (21) to the Top Frame (4) with two M4 x 12mm
Repeat this step for the Right Shroud (22).
8
22 4
102 | 21 |
|
9.Attach a Shroud Cover (23) to the Left and Right Shrouds (21, 22) with two M6 x 28mm Bolts (94), four M6 Washers (114), and two M6 Nylon Locknuts (107).
Attach the Shroud Cover (23) to the Top Frame
(4)with four M4 x 16mm
(110)and four M4 Washers (104).
See the inset drawing and attach the other Shroud Cover (23) in the same way.
9 | 114 |
|
|
| |
94 |
| 107 |
|
| |
23 |
| 114 |
|
| |
|
| 94 |
| 110 | 110 |
|
| |
22 | 4 |
|
|
| 104 |
|
| 21 |
23 |
|
|
11