24.Identify the Lat Cable (49). Route the Cable up through the Top Frame (4) and over a 90mm Pulley (48). Attach the Pulley inside the Top Frame with an M10 x 80mm Bolt (84), two M10 Washers (80), two 19mm Spacers (67), and an M10 Nylon Locknut (77).
25.Route the Lat Cable (49) over a Thin Pulley (24) and down through the Top Frame (4). Hold the Thin Pulley inside the Top Frame. Insert an M10 x 80mm Bolt (84) through an M10 Washer (80), a 19mm Spacer (67), the Top Frame, and the Thin Pulley.
26.Wrap the Lat Cable (49) under a 90mm Pulley (48). Attach the Pulley, a Cable Trap (56), and two Half Guards (55) at the second hole from the top of the two Pulley Plates (60) with an M10 x 50mm Bolt (97) and an M10 Nylon Locknut (77).
Make sure that the Cable Trap and the Half Guards are oriented as shown.
24 |
|
| |
84 | 48 | 4 | |
80 | |||
67 | |||
|
| ||
67 |
| 80 | |
| 49 | 77 | |
|
|
25 |
| 24 |
|
| |
| 84 | 4 |
| 80 | |
|
| |
49 | 67 |
|
26 |
77 |
49 |
55 |
55 |
60 |
56 48 |
97 |
60 |
17