Arm Assembly
10.Attach the Butterfly Frame Brace (6) to the Upright (2) with two M8 x 80mm Bolts (100), two M8 Washers (103), and two M8 Nylon Locknuts (78). Do not tighten the Nylon Locknuts yet.
11.Apply a small amount of the included grease in the locations shown. Insert a 56.5mm Spacer (69) into the indicated hole in the Leg Lever (12). Attach the Leg Lever to the Front Leg (10) with an M10 x 61mm Bolt Set (116). Make sure that the barrel of the Bolt Set is inserted through both sides of the bracket on the Front Leg. Make sure that the indicated rod is oriented as shown.
See the left inset drawing. Attach the Lock Plate (14) to the Front Leg (10) with the M8 x 69mm Shoulder Bolt (87), an M8 Washer (103), and an M8 Nylon Locknut (78).
See the right inset drawing. Insert the Lock Plate Pin (95) through the Lock Plate (14) and the Leg Lever (12). Attach the tether on the Lock Plate Pin to the Front Leg (10) with an M4 x 12mm
10 |
|
|
|
|
| 78 |
|
100 |
|
|
|
|
| 103 |
|
6 | 100 |
|
|
|
|
| |
| 2 |
|
|
11 |
| Grease |
|
|
|
| |
| Hole | 116 |
|
|
|
| |
Grease |
|
| |
| 69 |
| 116 |
| 12 |
|
|
|
| 10 |
|
| Rod |
|
|
|
| 103 |
|
| 10 | 14 |
|
|
|
| |
14 |
| 78 | 12 |
| 102 | ||
|
| 95 |
|
87 |
| 10 |
|
|
|
|
12