Spalding M881117, M881119, M881115, M881111 manual Section B Assemble the Elevator Tubes to Backboard

Page 20

SECTION B: ASSEMBLE THE ELEVATOR TUBES TO BACKBOARD

This is what your system will look like when you’ve finished this section.

TOOLS REQUIRED FOR THIS SECTION

(2) Socket Wrenches and Sockets

(2) 1/2”, (2) 9/16”, and 2 3/4” Wrenches

AND/OR

1/2” 9/16” 3/4”

1.

Identify elevator tubes (28 & 30).

Toward

Board

Upper Elevator tube

Tube supérieur du dispositif élévateur / Oberes Verlängerungsrohr /

Tubo elevador superior

Toward

Pole

30

Toward

Board

Lower Elevator tube

Tube inférieur du dispositif élévateur / Unteres Verlängerungsrohr /

Tubo elevador inferior

Toward

Pole

28

 

 

ID# M881111 12/05

20

Image 20
Contents Required Tools and Materials Before YOU Start ID# 588000 05/05 Safety Instructions Warranty Card Parts List See Hardware Identifier Hardware Identifier Bolts & Screws #22 Section a Assemble the Pole Middle Bottom Fill hole approximately 1/3 full with mixed concrete FIG. a IDE VIE W Keep Ground Sleeve Keep Ground Sleeve Middle Pole Front Side Tighten just until Side Section B Assemble the Elevator Tubes to Backboard Do not Tighten ID# M881111 12/05 27, and nut 24 as shown Container to Mix 12/05 ID# M881111 Install Slam Jam Rim to Backboard USE EYE Reinforcement Bar Install net Tools Required for this Section Use wedge to tap cap of ground sleeve until tight Do not Allow Children To Adjust Height