Spalding M881113, M881117, M881119, M881115, M881111 manual Install net

Page 29

9.

Fill pole with concrete approximately 1” (2.54 cm) below bottom elevator hole as shown.

1

IMPORTANT!:

FAILURE TO FILL YOUR POLE COMPLETELY WITH CONCRETE AS DESCRIBED IN THESE INSTRUCTIONS WILL VOID ALL WARRANTIES WRITTEN AND IMPLIED.

IMPORTANT!:

Make sure that concrete does not bulge from the end of pole assembly. Allow concrete to completely cure.

IMPORTANT!:

WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP.

CONCRETE MUST CURE.

10. Install net (34).

A.

B.

34

C.

D.

34

29

12/05

ID# M881111

Image 29
Contents Required Tools and Materials Before YOU Start ID# 588000 05/05 Safety Instructions Warranty Card Parts List See Hardware Identifier Hardware Identifier Bolts & Screws #22 Section a Assemble the Pole Middle Bottom Fill hole approximately 1/3 full with mixed concrete FIG. a IDE VIE W Keep Ground Sleeve Keep Ground Sleeve Middle Pole Front Side Tighten just until Side Section B Assemble the Elevator Tubes to Backboard Do not Tighten ID# M881111 12/05 27, and nut 24 as shown Container to Mix 12/05 ID# M881111 Install Slam Jam Rim to Backboard USE EYE Reinforcement Bar Install net Tools Required for this Section Use wedge to tap cap of ground sleeve until tight Do not Allow Children To Adjust Height