Spalding M881111, M881117, M881119, M881115, M881113 manual Ide Vie W

Page 13

6. Fill hole completely with concrete.

3

5

4

1" (2.54 cm)

IMPORTANT! CONTINUE ON TO NEXT STEP. DO NOT WAIT FOR CONCRETE TO CURE.

7. Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions several times while concrete is curing.

1" (2.54 cm)

NOTE:

Make a reference mark here for anti- skid tape.

NOTE:

Keep flange pushed

down to concrete

1" (2.54 cm)

DRAINAGE

HILL

PLAYINGSURFACE

and leveled.

SIDEVIEW

IMPORTANT! WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP.

CONCRETE MUST CURE.

13

12/05

ID# M881111

Image 13
Contents Required Tools and Materials Before YOU Start ID# 588000 05/05 Safety Instructions Warranty Card Parts List See Hardware Identifier Hardware Identifier Bolts & Screws #22 Section a Assemble the Pole Middle Bottom Fill hole approximately 1/3 full with mixed concrete FIG. a IDE VIE W Keep Ground Sleeve Keep Ground Sleeve Middle Pole Front Side Tighten just until Side Section B Assemble the Elevator Tubes to Backboard Do not Tighten ID# M881111 12/05 27, and nut 24 as shown Container to Mix 12/05 ID# M881111 Install Slam Jam Rim to Backboard USE EYE Reinforcement Bar Install net Tools Required for this Section Use wedge to tap cap of ground sleeve until tight Do not Allow Children To Adjust Height