Smooth Fitness Smooth Agile Trainer user manual Box E, Supplied Hardware

Page 8

8

SMOOTH AGILE TRAINER

SUPPLIED HARDWARE

This list identifies the hardware you will use to assemble the product. To help distinguish between the various types of screws and bolts, use the scale below to measure them and compare them to the sizes listed.

BOX - E

701 Upright Side Cover-Left

717

Pivot Cap 2PCS

702 Upright Side Cover-Right

718

Pivot Side Cap 2PCS

703 Console Back Cover

721 Pedal Arm Front Pivot 4PCS

326 Taper Fixing Insert 4PCS

501

12 x 62 - M10 x 20mm Bolt

2P CS

510

 

 

 

 

 

511

502

20 x 78 - M14 x 35mm Bolt

2PCS

512

 

 

 

 

 

503

M5 x 8mm Screw

 

2P CS

513

504

M8 x 20mm Allen Hea d Bolt

4PCS

514

505

M8 x 40mm Allen Hea d Bolt

2PCS

515

 

M8 x 65mm Allen Hea d Bolt

2PCS

506

516

507

M10 x 20mm Allen Head Bolt

4PCS

517

508

M10 x 62 mm Allen Head Bolt

1P CS

 

509

M6 x 40mm Screw

 

2PCS

518

 

519

 

 

 

 

 

A

B

C

D

E

F

Screwdriver-L

2.5mm

5mm

6mm

8mm

Wrench

Allen key

Allen key

Allen key

Allen key

(1 piece)

(1 piece)

(1 piece)

(1 piece)

(1 piece)

(1 piece)

J

K

Power Cord

Chest Belt

(1 piece)

(1 piece)

12 x 20 x 2 Spring Washe r

2PCS

M10 Nylon Nut

1P CS

4 x 12 mm Screw

10PCS

4 x 19mm Screw

6P CS

12 x 18 x 24.5mm Sleev e

2P CS

12 x 22 x 2 Was her

2PCS

M5 x 6mm Bolt

2PCS

M8 Nylon Nut

 

4PCS

8x20x1 .5mm Cup Was her

4PCS

M8x105x20 mm Carriage Bolts

4PCS

G

H

I

Slotted

5mm

Water Bottle

Screwdriver

Allen Wrench

(1 piece)

(1 piece)

(1 piece)

MILLIMETERS

Image 8
Contents Smooth Agile Trainer Inhaltsverzeichnis Table of Contents English DeutschPrecautions Power Requirements Preassembly Open the boxesBOX B Supplied ComponentsBOX D Front Side Panel LL LR Front Side Panel RL RRBOX E Supplied Hardware200 Complete Parts List100 300 Complete Parts List 400 500 600 700 Parts Diagram Parts Diagram Parts Diagram 230 Parts Diagram Parts Diagram Assembly 507Connect the Main Frame to Base Frame 507 618 619 104508 511 Connect the Incline Transmission Tube114 105 508 511 104 619 618 244512 Assemble the Undercarriage Covers107 512 106 720 104 105 512 719506 517 518 519 Assemble the UprightAttach the Pivot Arm Covers 503 717 718 Assemble the Pivot Cap717 503 718 503 120504 Assemble the Console Support Tube504 505 Assemble the Fixed HandlebarTighten all Bolts 416701 702 Assemble Upright Side Covers701 110 702 111502 Connect the Pedal Arm to the Pedal Swing Arm501 510 514 515 Connect the Moving Linkage109 113 515721 Assemble the Pedal Arm Front Pivot Covers516 106 120 516Tighten Set Screws 512 513 Assemble the Front Side Panels111 110 710 513 512 711 512 513615 616 312 103 509 622 509Assemble the Console 326 Assemble Console Back CoverLevel Adjustment Level AdjustmentLITE-TOUCH Control Operation Transport Instruction Transport InstructionsMuscle Chart Shoulder muscles Calf muscles Pectoral musclesBicep muscle Abdominal musclesStretching Routine Warm up and cool downComputer Operation Display Functions 16 DOT Matrix Intensity Level Profile DisplayENGLISH/METRIC Conversion Target Calories Intensity Interval ProgramMotion Interval Program Endurance ProgramTarget Heart Rate Control Program Lifetime Years Labor WarrantyElectronics Parts Sicherheitshinweise Stromversorgung Vorbereitung Legen Sie Werkzeug bereitLieferumfang FixedHaltegriffHandlebarKarton C Karton E LIEFERUMFANG, Einzelteile UND WerkzeugeErsatzteilliste Beschreibung Anz Best. NR Ersatzteilliste 400 500 600 AGILE-701 Explosionszeichnung 110 510 514 112 519 517 518 515 Explosionszeichnung 16-1 116-2 116-3 512 403 119 409 402 445 203 445 318 Explosionszeichnung Aufbau Schritt 1 Verbinden von Hauptrahmen und Grundrahmen619 618 244 Schritt 2 Montieren des Rohrs der Höhenverstellung508 Schritt 3 Montieren der unteren Abdeckung 107 512 106 105 720 104 719506 1 109 102 108 110 519 517 518 517518 617 618 707 120 707 120 706 704 512 114718 503 120 Schritt 6Montieren der Abdeckkappe717 503 ABBFIG3 Schritt 7 Montieren des HaltebügelsSchritt 8 Montieren des Haltegriffs Schritt STEPSchritt 2Schritt 10 Montieren der seitlichen Abdeckungen Schritt 11 Montieren der Fußstütze am Swingarm der Fußstütze 2 E501 510 514 515 FIGAbb Schritt 12 Montieren der Bügel zur FußstützeSchritt 13 Montieren der vorderen Abdeckung der Fußstützen Schritt 14 Festziehen aller Schrauben Schritt 15 Montieren der vorderen Außenverkleidung Schritt 16 Montieren des Computers 615 616 312 103 509 622Schritt 17 Montieren der hinteren Computerabdeckung Stabiliesierung StabilisierungWiderstand Ellipse LITE-TOUCH Control FunktionTransporthinweise Muskelübersicht Quadrizeps-Muskeln Oberschenkelmuskulatur, hintereDehnübungen Aufwärmen und AbkühlenComputerbedienung 16 DOT Matrix Widerstands Profil Anzeige 8 DOT Matrix Ellipsenlängen AnzeigeTON Ein / Aus Vorgaben Programm Target ProgramZeitvorgabe Target Time Streckenvorgabe Target DistanceWiderstands Intervall Programm Kalorienvorgabe Target CalorieFettverbrennungsporgramm Fat Burning Leistungskontrolle Programm Watts Control Program Ellipsen Intervall ProgammAusdauer Programm Endurance Program Zielpulsprogramm Target Heart Rate Control Program Garantie Mail info@smoothfitness.co.uk