9.Remove the Chrome Tube (118) from the left Handlebar Leg (79). Apply a small amount of the included
See the drawing at the right and the inset drawing. Apply a thin film of grease to the shaft of a Union Bolt Set (27). Insert the shaft of the Union Bolt Set into the side of the left Flex Bar (14) closest to the Upright (2), and then slide a 4.7mm Spacer (143) onto the shaft. Next, slide the end of the left Chrome Tube (118) onto the shaft and onto the Spacer. Then, slide a Wheel Bushing (28), a Ramp Wheel (119), and another Wheel Bushing onto the shaft. Make sure that all parts are oriented exactly as shown. Insert the shaft completely through the Flex Bar and tighten the screw of the Union Bolt Set into the shaft.
Repeat this step to attach the right Chrome Tube (118) to the right Flex Bar (14).
10.Identify the Left Pedal (13). Attach the Left Pedal to the left Flex Bar (14) with an M10 x 35mm Carriage Bolt (20), an M10 Washer (99), an M10 Split Washer (144), and a Pedal Knob (15) as shown. Note: The Left Pedal can be attached in any of five positions (see HOW TO ADJUST THE PEDALS on page 11).
Attach the Right Pedal (12) in the same way. Make sure that both Pedals are in the same position.
See step 7. Tighten the four M8 x 43mm Button Bolts (50).
11.Loosen the eight indicated screws (A) in the Center Handlebar (63).
Attach the Center Handlebar (63) to the Upright (2) with eight M6 x 16mm Tapered Button Screws (107).
Do not tighten the Tapered Button Screws yet.
Retighten the eight screws (A) in the Center Handlebar (63).
9
9 |
| 79 |
|
|
|
|
|
| |
|
|
| 2 |
|
| Lubricate |
| 118 | |
|
| 118 | 143 |
|
| 119 | 28 |
| 14 |
|
| 27 | ||
|
|
| ||
|
|
|
| |
| 28 |
|
|
|
|
| 27 | 14 |
|
|
| 119 | 118 | Grease |
27 | 14 | 143 14 | ||
|
|
|
| 27 |
Screw | 28 | 28 | Shaft | |
|
|
| ||
10 |
|
|
|
|
|
|
| 20 | 12 |
|
|
|
| |
| 14 |
|
| 13 |
|
|
| 144 |
|
|
|
| 99 |
|
|
|
| 15 |
|
11 |
|
|
|
|
|
|
| 63 |
|
|
|
|
| A |
|
|
| 2 |
|
107 |
|
|
|
|
| 107 |
|
|
|