3.Attach an Upright (1) to each Base (7) using four Joint Plates (12), eight M10 x 80mm Bolts (41), and eight M10 Nylon Locknuts (11). Make sure the Uprights are oriented exactly as shown. Do not tighten the Nylon Locknuts yet.
4.Insert a Weight Guide (18) into the indicated hole in each Base (7). Attach the Weight Guides to the Bases using two M10 x 75mm Bolts (39), four M10 Small Washers (6), and two M10 Nylon Locknuts (11). Do not tighten the Nylon
Locknuts yet.
5.Press a 25mm Bushing (48) into each end of the Locking Bar (34). Slide the Barbell (35) into the Locking Bar.
3 |
|
|
1 |
|
|
41 |
|
|
7 | 1 |
|
12 |
|
|
|
| 7 |
12 |
|
|
| 11 |
|
| 12 |
|
| 12 | 41 |
|
| |
4 |
|
|
18 |
|
|
39 |
|
|
6 | 7 |
|
|
| |
6 |
|
|
11 | 18 |
|
|
| |
| 11 | 39 |
| 6 | |
|
| |
| 7 | 6 |
|
| |
5 |
|
|
48 | 34 |
|
|
| 35 |
| 48 |
|
6