American Dryer Corp Super AD-30 manual Location Requirements, Section D

Page 13

B. LOCATION REQUIREMENTS

Before installing the dryer, be sure the location conforms to local codes and ordinances. In the absence of such codes or ordinances the location must conform with the National Fuel Gas Code ANSI.Z223.1- LATEST EDITION, or in CANADA, the Canadian Installation Codes CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 (L.P. Gas) or LATEST EDITION.

1.The dryer must be installed on a sound level floor capable of supporting its weight. It is recommended that carpeting be removed from the floor area that the dryer is to rest on.

2.The dryer must not be installed or stored in an area where it will be exposed to water and/or weather.

3.Provisions for adequate air supply must be provided as noted in this manual (refer to Fresh Air Supply in

Section D

4.Clearance provisions must be made from combustible construction as noted in this manual (refer to Dryer Enclosure Requirements in Section C).

5.Provisions must be made for adequate clearances for servicing and for operation as noted in this manual (refer to Dryer Enclosure Requirements in Section C).

6.Dryer must be exhausted to the outdoors (refer to Exhaust Requirements in Section E).

7.Dryer must be located in an area (refer to Exhaust Requirements

where correct exhaust venting can be achieved as noted in the manual in Section E).

IMPORTANT: Dryer should be located where a minimum amount of exhaust duct will be necessary.

9

Image 13
Contents Super AD-30 Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Troubleshooting Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsPage Specifications Super AD-30 SpecificationsSpecifications UNPACKING/SETTING UP Installation ProceduresSection D Location RequirementsDryer Enclosure Requirements Fresh AIR Supply Exhaust Requirements Single Dryer Venting Illus. B Multiple Dryer Common Venting ILLUS. D Important Venting Reminders Electrical Information Page Green Phase 3ø Hookup for GAS and Steam Dryers only Page Super ADG-30DS Gas Reversing Super ADS-30DS Steam Reversing GAS Information Piping/Connections Page Page Steam Information Page 70 psi Normal 80 psi90 psi Page Preparation for Operation Preoperational Tests Page Preoperational Instructions Page OPL Models Shut Down Instructions Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceLubrication AdjustmentsNo L.E.D. light emitting diode display TroubleshootingDrive motor not operating does not start Blower motor not operating does not start Microprocessor controller computer display reads door Microprocessor computer display reads dSFLPage Dryer operates but is taking too long to dry No heat for Steam Models onlyDryer or scraping noise at basket tumbler area Condensation on main door glassExcessive noise and/or vibration Blower motor only not operating Drive motor only not operatingHeat unit not operating for only one 1 temperature selection Heating unit not operating ALL temperature selectionsFailed hi-limit thermostat for GAS and Electric Models only Dryer operates but is taking too long to dry loadPage Timing Legend Reversing Timer SPIN/DWELL AdjustmentsData Label Technical InformationContact American Dryer Corporation Data Label Microprocessor computer Board Procedure for Functional Check Replacement ComponentsDirect Spark Ignition DSI System