American Dryer Corp Super AD-30 manual Fresh AIR Supply

Page 15

D. FRESH AIR SUPPLY

The SUPER AD-30 air supply (make-up air) must be given careful consideration to assure proper performance of each dryer. An unrestricted source of air is necessary for each dryer. As a general rule, an unrestricted air entrance from the outdoors (atmosphere) of a minimum of 1-1/2 square feet is required for each dryer. If registers or louvers are installed over the openings, then the area must be increased. It is not necessary to have a separate make-up air openings for each dryer. Common make-up air openings are acceptable. However, they must be set up in such a manner that the make-up air is distributed equally to the dryers.

EXAMPLE: For a bank of four (8) dryers, two (2) unrestricted openings measuring 2 feet by 3 feet (6 square feet) is acceptable.

IMPORTANT: Make-up air openings should not be located in an area directly near where exhaust vents exit the building.

Allowances must be made for remote or constricting passageways or where dryers are located at excessive altitudes or predominantly low pressure areas.

IMPORTANT: Make-up air must be provided from a source free of dry cleaning solvent fumes. Make-up air that is contaminated by dry cleaning solvent fumes will result in irreparable damage to motors and other dryer components.

NOTE: Component failure due to dry cleaning solvent fumes will VOID THE WARRANTY.

11

Image 15
Contents Super AD-30 Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Troubleshooting Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsPage Specifications Super AD-30 SpecificationsSpecifications UNPACKING/SETTING UP Installation ProceduresSection D Location RequirementsDryer Enclosure Requirements Fresh AIR Supply Exhaust Requirements Single Dryer Venting Illus. B Multiple Dryer Common Venting ILLUS. D Important Venting Reminders Electrical Information Page Green Phase 3ø Hookup for GAS and Steam Dryers only Page Super ADG-30DS Gas Reversing Super ADS-30DS Steam Reversing GAS Information Piping/Connections Page Page Steam Information Page Normal 80 psi 70 psi90 psi Page Preparation for Operation Preoperational Tests Page Preoperational Instructions Page OPL Models Shut Down Instructions SERVICE/PARTS Information ServiceParts Returning Warranty Parts Warranty InformationReturning Warranty Cards WarrantyPage Cleaning Routine MaintenanceLubrication AdjustmentsTroubleshooting No L.E.D. light emitting diode displayDrive motor not operating does not start Blower motor not operating does not start Microprocessor controller computer display reads door Microprocessor computer display reads dSFLPage Dryer operates but is taking too long to dry No heat for Steam Models onlyCondensation on main door glass Dryer or scraping noise at basket tumbler areaExcessive noise and/or vibration Blower motor only not operating Drive motor only not operatingHeat unit not operating for only one 1 temperature selection Heating unit not operating ALL temperature selectionsFailed hi-limit thermostat for GAS and Electric Models only Dryer operates but is taking too long to dry loadPage Timing Legend Reversing Timer SPIN/DWELL AdjustmentsTechnical Information Data LabelContact American Dryer Corporation Data Label Microprocessor computer Board Procedure for Functional Check Replacement ComponentsDirect Spark Ignition DSI System