American Dryer Corp AD-15 Phase 7 installation manual Data Label Information

Page 23

ADJUSTMENTS

7 DAYS AFTER INSTALLATION AND EVERY 6 MONTHS THEREAFTER

Inspect bolts, nuts, screws, setscrews, grounding connections, and nonpermanent gas connections (unions, shutoff valves, and orifices). Motor and drive belts should be examined. Cracked or seriously frayed belts should be replaced. Tighten loose V-belts when necessary. Complete operational check of controls and valves. Complete operational check of ALL safety devices (door switches, lint drawer switch, sail switch, burner, and hi-limit thermostats).

LUBRICATION

The motor bearings, idler bearings and under normal/most conditions the basket (tumbler) bearings are permanently lubricated. It is physically possible to relubricate the basket (tumbler) bearings if you choose to do so even though this practice is not necessary. Use Shell Alvania #2 grease or its equivalent. The basket (tumbler) bearings used in the dryer DO NOT have a grease fitting. Provisions are made in the bearing housing for the addition of a grease fitting which can be obtained elsewhere, or from ADC by ordering kit P/N 882159 (includes two [2] fittings).

DATA LABEL INFORMATION

When contacting American Dryer Corporation, certain information is required to ensure proper service/parts information from ADC. This information is on the data label that is affixed to the upper left side panel area behind the top control (access) door. When contacting ADC, please have the model number and serial number available.

THE DATALABEL

MODEL NUMBER

The model number is an ADC number, which describes the size of the dryer and the type of heat (gas, electric, or steam).

SERIAL NUMBER

The serial number allows ADC to gather information on your particular dryer.

MANUFACTURING CODE NUMBER

The manufacturing code number is a number issued by ADC, which describes ALL possible options on your particular model.

TYPE OF HEAT

This describes the type of heat for your particular dryer: gas (either natural gas or liquid propane [L.P.] gas), electric, or steam.

HEAT INPUT (FOR GAS DRYERS)

This describes the heat input in British Thermal Units per Hour (Btu/hr).

ORIFICE SIZE (FOR GAS DRYERS) Gives the number drill size used.

ELECTRIC SERVICE

This describes the electric service for your particular model.

GAS MANIFOLD PRESSURE (FOR GAS DRYERS)

This describes the manifold pressure taken at the gas valve tap.

113243-1

www.amdry.com

21

Image 23
Contents ADC Part No AD-15 Phase Installation ManualDate of Purchase Model no RESELLER’S Name Serial Numbers Retain This Manual In a Safe Place For Future ReferenceTable of Contents Latest Edition Safety PrecautionsWhat to do if YOU Smell GAS FIP SpecificationsLocation Requirements Installation ProceduresUNPACKING/SETTING UP Exhaust Requirements Dryer Enclosure RequirementsFresh AIR Supply Requirements Illus. a Single Dryer VentingHorizontal Venting Multiple Dryer Common Venting Vertical VentingIllus. B Illus. C Electrical Information Important Venting RemindersGrounding Gas and Steam Models OnlyFor 110V Applications Electrical ConnectionsKLWHRU5HG For 208-230/240V Applications Gas Supply GAS InformationSteam Information Never Test for Leaks with a FlameVoid the Warranty 0DLPXP6XSSO\ 1RUPDO0LQLPXP6XSSO\ Preoperational Tests GAS and Electric Models the sail switchPreparation for OPERATION/START-UP Preoperational Instructions GAS and Electric Models only Sail SwitchBasket Tumbler Coating MIN Remain Reversing Timer SPIN/DWELL AdjustmentsWarranty Information SERVICE/PARTS InformationSuggested Cleaning Schedule Routine MaintenanceCleaning Data Label Information Procedure for 113243-1 Dual Timer Manual Reset Burner HI-LIMIT InstructionsPhase Before YOU Start Check Local Codes and Permits InstallationOptional Manual Bypass Coin NON-COINF.E. System Parts Break Down F.E. System Diagnostics MessagesADC 113243 1 2/03/04