American Dryer Corp AD-15 Phase 7 installation manual For 208-230/240V Applications

Page 13

For 208-230/240V Applications

A ground lug is provided in the rear electrical box to connect your service ground.

3-Phase (3ø) Wiring Connections/Hookup

The electrical connections on ALL 3-phase (3ø) gas and steam dryers are made into the rear service box located at the upper left area of the dryer. The electrical connections are made at the power distribution block located in the service box. The ground connection is made to the copper lug, also provided in this box. To gain access, the service box cover must be removed.

The neutral will only be used on 4-wire service. This is typical for 380-416V, 50 Hz.

Electrically Heated Models Only

The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, L3, and sometimes neutral) and ground. Single-phase (1ø) power for the control circuit and for any single-phase (1ø) motors (if present) is done internally to the dryer by the factory at the oven contactor. No single-phase (1ø) input connection is required on a 3-phase (3ø) dryer.

CAUTION:

!The dryer must be grounded. A ground lug has been provided for this purpose.

Input connection wiring must be sized properly to handle the dryer’s current draw. This information is printed on the dryer’s data label.

The electrical input connections are made at the electric oven contactor located inside the assembly at the rear center upper section of the dryer. The ground connection is made to a copper lug also provided in this area. To gain access, remove oven rear service cover.

IMPORTANT:

!A strain relief must be used where the input wiring enters the oven assembly.

113243-1

www.amdry.com

11

Image 13
Contents ADC Part No AD-15 Phase Installation ManualDate of Purchase Model no RESELLER’S Name Serial Numbers Retain This Manual In a Safe Place For Future ReferenceTable of Contents What to do if YOU Smell GAS Safety PrecautionsLatest Edition FIP SpecificationsUNPACKING/SETTING UP Installation ProceduresLocation Requirements Fresh AIR Supply Requirements Dryer Enclosure RequirementsExhaust Requirements Horizontal Venting Single Dryer VentingIllus. a Illus. B Illus. C Vertical VentingMultiple Dryer Common Venting Electrical Information Important Venting RemindersGrounding Gas and Steam Models OnlyKLWHRU5HG Electrical ConnectionsFor 110V Applications For 208-230/240V Applications Gas Supply GAS InformationSteam Information Never Test for Leaks with a FlameVoid the Warranty 0LQLPXP6XSSO\ 1RUPDO0DLPXP6XSSO\ Preparation for OPERATION/START-UP GAS and Electric Models the sail switchPreoperational Tests Basket Tumbler Coating GAS and Electric Models only Sail SwitchPreoperational Instructions MIN Remain Reversing Timer SPIN/DWELL AdjustmentsWarranty Information SERVICE/PARTS InformationCleaning Routine MaintenanceSuggested Cleaning Schedule Data Label Information Procedure for 113243-1 Phase Manual Reset Burner HI-LIMIT InstructionsDual Timer Before YOU Start Check Local Codes and Permits InstallationOptional Manual Bypass Coin NON-COINF.E. System Parts Break Down F.E. System Diagnostics MessagesADC 113243 1 2/03/04