PROCEDURE FOR | Phase 7 |
| |
FUNCTIONAL CHECK OF | • Upon completing installation of the replacement |
REPLACEMENT | reestablish power to the dryer. |
| microprocessor controller (computer) board, |
COMPONENTS | • Start the drying cycle by pressing any of the preset |
| cycles in letters |
Microprocessor Controller (Computer) Board
Phase 7 Coin Models
•Upon completing installation of the replacement
microprocessor controller (computer) board, reestablish power to the dryer.
• Start the drying cycle by pressing any temperature selection keys (HI, MED, or LO).
• Verify that the applicable indicator lights on the | • Verify that the applicable indicator lights on the | |
microprocessor controller (computer) board are | ||
microprocessor controller (computer) board are | ||
lit. (Refer to the illustration below.) | ||
lit. (Refer to the illustration below.) | ||
|
22 | American Dryer Corp. |