4 BASIC OPERATION
■Checking the installation
Before turning the power ON, be sure all the connec- tions are complete. The checklist at right may be help- ful for necessary confirmation.
CAUTION: Connect the scanner unit before turning the power ON. Otherwise the magnetron inside the scanner unit might be damaged.
DChecklist
qThe 4 bolts securing the scanner unit must be firmly tightened.
wCabling must be securely attached to a mast or mounting material, and must not interfere with the rigging.
eBe sure waterproofing procedures are completed on the system cable.
rThe power connections to the battery must be of the correct polarity.
tBe sure that the plugs at the rear of the display unit have been connected correctly and securely.
(See p. 24 for details.)
■Turning power ON/OFF
1 | (0.25) |
| T.VECT 6M |
NM CURS | 000 . 0 ˚ T | 0.000NM | |
SOG17 . 7KT | H UP | HDG253 . 4 ˚ T |
IR
|
| 0.45 |
| |
|
| R E V | *.* |
|
|
| ROM | OK |
|
|
| RAM | OK |
|
GPS |
|
|
|
|
COMPASS |
|
|
|
|
E B L 1 |
| V R M 1 |
| |
E B L 2 |
| V R M 2 |
| |
MOB |
|
|
|
|
CURS | 3 4 ˚ 3 7 . 7 2 N | 1 3 5 ˚ 3 4 .4 2 E | ||
(0.25) |
| S T B Y | T.VECT 6M | |
1 NM | CURS | 000 . 0 ˚ T | 0.000NM | |
SOG17 . 7KT | H UP | HDG253 . 4 ˚ T |
IR
GPS
COMPASS
E B L 1 |
|
| V R M 1 | |
E B L 2 |
|
| V R M 2 |
|
MOB |
|
|
|
|
CURS | 3 4 ˚ 3 7 . 7 2 N 1 3 5 ˚ 3 4 .4 2 E |
qPush [POWER]/[ ] to turn the power ON.
•The initial screen appears and warming up time is counted down on the screen.
•The magnetron inside the scanner unit warms up for 90 sec.
•[POWER]/[ ] does not function for 2 sec. after the power is turned OFF.
wWhen the countdown is completed, the Standby screen appears.
ePush [TX]/[ ] to start scanning and select the Plan Position Indicator (PPI) screen.
•Targets and heading marker appear.
•The screen appears approx. 2 sec. after turning the power on, when ‘AUTO’ is selected in the “TUNE” of the VIDEO menu.
rPush [POWER]/[ ] to turn the power OFF.
8