Furuno FR-2115-B installation manual Leading in cables to the processor unit, Ant

Page 26

2.2.3 Leading in cables to the processor unit

Cables are led in to the processor unit through the cable clamp at the rear of the unit. Use the

shielding foam (supplied) as below to protect against noise radiation.

Nav equipment

(Gyro, etc.)

Slave display

 

Navigator*

 

 

Control

Log*

unit

ANT

PWR

 

Monitor

Cable position in cable clamp

(Processor unit, rear view)

Rubber plug

* When no log or nav equipment is installed, insert rubber plug (supplied) to the left of keyboard cable to hold the cable in place.

 

Pan-head screw

Hex bolt

M4X8

 

M5X12 SUS

 

2 pcs

(D) Rear clamp

 

plate

Hex bolt

(C) Signal clamp

M5X35 SUS

(Aluminum)

2 pcs

 

Hex bolt

 

M5X35 SUS

(B) Power clamp

2 pcs

(Aluminum)

 

 

(A) Rear clamp

(Construction of

base

 

cable clamp)

 

(D) Rear clamp plate

Make sure shielding foam contacts rear chassis.

(C) Signal cable

 

Rear cable entrance

(Aluminum)

 

 

 

 

 

 

 

 

(B) Power clamp (Aluminum)

 

Cable

(A) Rear clamp base

Shielding foam

 

(Processor unit, right-hand side view)

(Processor unit, rear view)

Figure 2-10 Cable clamp position

Place shielding foam between cables, and then attach foam to aluminum clamps.

Fill unused clamp holes with shielding foam.

Connect a ground wire between the earth terminal on the processor unit and ship's superstructure.

CAUTION

Ground the equipment to prevent electrical shock and mutual interference.

2-7

Image 26
Contents Marine Radar FR-2115-B/FR-2125-B B . N o . I M E 3 4 8 3 0 H Safety Instructions Radio Frequency Radiation HazardDo not open the equipment Equipment Lists Standard supply System without monitor Optional equipment System Configuration Data SentencesMounting Assembling the antenna unit Fastening the radiator to the radiator bracket Fastening the antenna unit to the mounting platform How to mount the antenna unit Processor Unit Mounting the processor unit Processor unit, inside view Monitor Mounting the monitor Control Unit Antenna Unit Mounting the antenna chassisAntenna unit, front view, cover removed Correct seating of waterproofing gasket Fabricating signal cable S03-75 2C-2VFabricating the AC power cable Processor UnitFabricating the DC power cable CVV-S 8X2C, option CVV-S 8X2CLeading in cables to the processor unit ANTMonitor Connection of monitor cable inside the monitor Connect the monitor cable inside the monitor as belowControl Unit Power Connectors on the INT Board AC Power Specification of Processor Unit How to attach NH connectorAdjusting Video Signal Level Tuning InitializationAccessing Menus for Initialization and Adjustment Restoring default settingsHeading Alignment Picture appears Deviated counterclockwiseAdjusting Sweep Timing Suppressing Main BangConfirming Magnetron Heater Voltage Magnetron heater voltage ratingInitial Setting Menus Press Radar Menu 0 0 0Initial SETTING1 menu Initial SETTING3 menu Installation and connection of the Gyro Converter Board Gyro Converter GC-8INT Board Gyro Converter Board J446 4P J7 5P J465 6P J1 14P Connection of external power supply DIP switch, jumper wire settingsRotor Voltage between R1 & R2 Stator Voltage between S1 & S2 JP1 JP2 JP3 JP4 JP5 Setting the heading readout on the radar display SW1ARP Board ARP-26 ARP board adjustment ARP Board 18P9002BRP Board RP-26 Final check of ARP board10 Processor unit, inside view 11 Processor unit, front view 12 Processor, front and top views Performance Monitor PM-30 Necessary parts PM-30 and OP03-150 Code noAlarm Kit AC-DC Conversion Kit J474 Arpa CPA/TCPA15 Processor unit, inside view Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page