Furuno FR-2115-B installation manual Assembling the antenna unit

Page 10

1.1.2 Assembling the antenna unit

The antenna unit consists of the antenna radiator and the antenna unit chassis, and they are packed separately. Fasten the antenna radiator to the antenna unit chassis as follows:

1.For the XN20AF, XN24AF, attach two guide pins to the underside of the antenna radiator.

2.Remove the waveguide cap from the radiator bracket. The cap may be discarded.

3.Coat the waveguide flange with anticorrosive sealant as shown in Figure 1-1.

10 mm O-ring

Hole for

a guide pin

5 mm

Hole for

a guide pin

Anticorrosive sealant

Figure 1-1 Coating the waveguide flange with anticorrosive sealant

4.Coat fixing holes for the antenna radiator with anticorrosive sealant.

5.Grease the O-ring and set it to the O-ring groove of the radiator flange.

6.Set the antenna radiator to the radiator bracket.

7.For the XN20AF, XN24AF, coat hex bolts (M8X40, slotted washer-head, 8 pcs.) with anticorrosive sealant and use them to loosely fasten the antenna radiator to the antenna unit chassis. For the XN12AF, coat hex bolts, flat washers and spring washers with anticorrosive sealant and use them to loosely fasten the antenna radiator to the antenna unit chassis.

8.For the XN20AF, XN24AF, remove two guide pins (inserted at step 1).

9.Tighten the bolts loosely fastened at step 7.

CAUTION

Be sure to remove the guide pins.

Injury may result if the guide pins loosen and fall.

1-2

Image 10
Contents Marine Radar FR-2115-B/FR-2125-B B . N o . I M E 3 4 8 3 0 H Safety Instructions Radio Frequency Radiation HazardDo not open the equipment Equipment Lists Standard supply System without monitor Optional equipment System Configuration Data SentencesMounting Assembling the antenna unit Fastening the radiator to the radiator bracket Fastening the antenna unit to the mounting platform How to mount the antenna unit Processor Unit Mounting the processor unit Processor unit, inside view Monitor Mounting the monitor Control Unit Antenna Unit Mounting the antenna chassisAntenna unit, front view, cover removed Correct seating of waterproofing gasket Fabricating signal cable S03-75 2C-2VFabricating the AC power cable Processor UnitFabricating the DC power cable CVV-S 8X2C, option CVV-S 8X2CLeading in cables to the processor unit ANTMonitor Connection of monitor cable inside the monitor Connect the monitor cable inside the monitor as belowControl Unit Power Connectors on the INT Board AC Power Specification of Processor Unit How to attach NH connectorAdjusting Video Signal Level Tuning InitializationAccessing Menus for Initialization and Adjustment Restoring default settingsHeading Alignment Picture appears Deviated counterclockwiseAdjusting Sweep Timing Suppressing Main BangConfirming Magnetron Heater Voltage Magnetron heater voltage ratingInitial Setting Menus Press Radar Menu 0 0 0Initial SETTING1 menu Initial SETTING3 menu Installation and connection of the Gyro Converter Board Gyro Converter GC-8INT Board Gyro Converter Board J446 4P J7 5P J465 6P J1 14P Connection of external power supply DIP switch, jumper wire settingsRotor Voltage between R1 & R2 Stator Voltage between S1 & S2 JP1 JP2 JP3 JP4 JP5 Setting the heading readout on the radar display SW1ARP Board ARP-26 ARP board adjustment ARP Board 18P9002BRP Board RP-26 Final check of ARP board10 Processor unit, inside view 11 Processor unit, front view 12 Processor, front and top views Performance Monitor PM-30 Necessary parts PM-30 and OP03-150 Code noAlarm Kit AC-DC Conversion Kit J474 Arpa CPA/TCPA15 Processor unit, inside view Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page