Sterling SSV 05 operating instructions SSV General information

Page 15

SSV 05

2.1. General information

Unpack all parts of the single conveyor unit and make sure that everything is available:

conveyor hopper with level probe (1)

control and maintenance unit (2)

injector tube (3)

supply hose (4) with 2 hose clamps

compressed-air hose

operating instructions

SM4-600

4

1

0

1

2

3

Installation instructions 14

Image 15
Contents Sterling Material Processing Operating Instructions Single Conveyor Unit SSVParts and Service Department Technical service SSV Sterling Material ProcessingTelephone 800 Edition 08/99 SSV Table of contents SSV Technical data Safety instructions Safety instructionsSSV SSV Explanations and information SSV For your safety SSV SSV SSV For the safety of the units Installation instructions SSV General information SSV Installing the conveyor hopper SSV Installing the control and maintenance unit SSV Connecting the compressed-air supply SSV Electrical connection Functional description SSV Method of functioning Control and maintenance unitSet-up Filling level too high Basic setting of the filling level in the conveyor hopperSSV Preparations Filling level too lowSet-up Maintenance SSV SSV Maintenance intervals Disassembly SSV Cleaning/replacing the filter cartridgeAdjusting the level probe SSV AssemblyTest steps SSV Trouble-shooting Problem RemedyTechnical data SSV Dimension sheet SSV Spare parts list SSV Pos ID-No Designation