Sterling SSV 05 operating instructions SSV Installing the control and maintenance unit

Page 17

SSV 05

2.3. Installing the control and maintenance unit

Install the control and maintenance unit at a freely accessible site. Ob- serve the length of the connection ca- ble and of the supplied hoses to the injector tube.

1

0

F

During installation, observe the length of the supply lines.

SM4-600

Installation instructions 16

Image 17
Contents Sterling Material Processing Operating Instructions Single Conveyor Unit SSVParts and Service Department Telephone 800 Edition 08/99 Technical serviceSSV Sterling Material Processing SSV Table of contents SSV Technical data Safety instructions Safety instructionsSSV SSV Explanations and information SSV For your safety SSV SSV SSV For the safety of the units Installation instructions SSV General information SSV Installing the conveyor hopper SSV Installing the control and maintenance unit SSV Connecting the compressed-air supply SSV Electrical connection Functional description SSV Method of functioning Control and maintenance unitSet-up SSV Preparations Basic setting of the filling level in the conveyor hopperFilling level too low Filling level too highSet-up Maintenance SSV SSV Maintenance intervals Disassembly SSV Cleaning/replacing the filter cartridgeAdjusting the level probe SSV AssemblyTest steps SSV Trouble-shooting Problem RemedyTechnical data SSV Dimension sheet SSV Spare parts list SSV Pos ID-No Designation