Nordyne RL 90+, RC 92+ Furnace on a Wood Floor, Downflow Sub-Base Dimensions

Page 14

Downflow

 

Wood

Sub-base

Furnace

Floor

 

Sheet

 

 

Metal

 

 

Plenum

 

Figure 8. Furnace on a Wood Floor

 

 

* RL 040/060

18.75"

 

** RL 120

 

 

 

 

or 13.25" or 21.50"*

 

 

 

 

 

 

2.0"

16.75"

28.38"

 

or 11.25"

 

 

 

3 lbdensity

 

1.50"

 

thick fiberglass

19.63"

 

 

 

1.58"

 

 

1 inch

 

 

 

 

19.75"

 

3"

 

or 14.25"*

 

 

 

or 22.50"**

 

 

 

Figure 9. Downflow Sub-Base

Dimensions

14

Upflow Models

Protective

Screen

Downflow Models

 

Figure 10. Protective Screen for

One Pipe Installations

 

Each opening must

 

be at least 100 sq. in.

 

or 1 sq. in. per 1000

Vent or

Btuh of total input

Chimney

rating, whichever is

 

greater. See minimum

 

area per table.

12" Max.

Furnace

12" Max.

Water Heater

 

Minimum

 

Total Input

Free Area

Round Duct

Rating (Btuh) (Each Opening)

Diameter

40,000

100 sq. in.

12"

60,000

100 sq. in.

12"

80,000

100 sq. in.

12"

100,000

100 sq. in.

12"

120,000

120 sq. in.

13"

140,000

140 sq. in.

14"

160,000

160 sq. in.

15"

Figure 11. Equipment in a Confined Space with all Combustion Air drawn from Inside

Image 14
Contents Installation Instructions What to do if YOU Smell GASPage Table of Contents Furnace Specifications Downflow *RL Furnace Capacities -Furnace Airflow Data G6RC Upflow FurnaceCapacities Important Note Safety InformationInstallation Requirements Requirements and Codes Clearances to Combustible Materials Minimum Clearances to Combustible MaterialLocation Horizontal InstallationsDownflow Warning *RL Models Vinyl Cap Grey Tubing Installation on a combustible floor *RL Supplyair Plenum InstallationInstallation on a concrete slab *RL Circulating AIR SupplyReturn Air Venting and Combustion AIR RequirementsDownflow Sub-Base Dimensions Furnace on a Wood FloorEquipment in a Confined Installation In a Confined Space Air Requirements For One-Pipe InstallationInstallation In An Unconfined Space Combustion Air QualityVenting Requirements Vent Pipe Length and Diameter SolutionVent Pipe Material Seal any unused openings in the vent- ing systemVent Table Upflow FurnacesDownflow Furnaces Location of Outdoor Terminations Vent Pipe InstallationPipe Routing and Support Horizontal VentingVertical Venting Page Vent Termination Clearances for Direct Vent Furnaces For appliances 100,00 Btuh 30 kW Vertical Venting Vent ProtectionUpflow Models = 12 Above Roof or Snow Accumulation LevelVent Freezing Protection Side Wall Vent Kit Drainage of Condensate from FurnaceConcentric Vent Termination GAS Supply and Piping Leak CheckManifold Pressure in WC for Natural Gas at Various Altitudes Above Sea LevelNatural Gas High Altitude Conversion ConversionHigh Altitude Application LP/Propane Gas Sea Level and High Altitude ConversionLow Voltage Wiring Electrical WiringLine Voltage Wiring Verifying and Adjusting Firing Rate START-UP and AdjustmentsStart-Up Procedure Firing rate = 1040 x 90 = 93,600 BtuhVerifying and Adjusting Temperature Rise Blower Speed Tap LocationDescription of Components Verifying Operation of the Supply Air Limit SwitchVerifying Burner Operation Gas Flow RateMaintenance For Upflow and Downflow Residential Furnaces WD#Upflow Furnace Models Downflow Furnace ModelsSequence of Operation Heating ModeSystem Operation Information Furnace Fails to Operate Cooling ModeFan Mode Twinning of Two FurnacesINSTALLATION/PERFORMANCE Check List Fuel Type