Nordyne RC 92+, RL 90+ installation instructions Upflow Furnaces, Downflow Furnaces, Vent Table

Page 19

APPLICATION

SINGLE PIPE LENGTH (ft.)

 

DIRECT VENT, DUAL PIPE LENGTH (ft.)

 

 

with 1 long radius elbow*

 

with 1 long radius elbow on each pipe*

 

PVC,CPVC or ABS

Outlet

Outlet

Inlet/Outlet

Inlet/Outlet

Inlet/Outlet

SCH. 40 Pipe Size

2”

3”

2”

 

2”

3”

2”

3”

 

3”

Models 040

80

150

40

 

40

50

50

90

 

90

 

 

 

 

 

 

 

 

 

 

 

Models 060 & 080

60

150

30

 

30

35

35

90

 

90

 

 

 

 

 

 

 

 

 

 

 

Models 100 & 120

30

150

15

 

15

25

25

90

 

90

 

 

 

 

 

 

 

 

 

 

 

**NOTES

1.Subtract 2.5 ft. for each additional 2” long radius elbow, 5 ft. for each additional 2” short radius elbow, 3.5’ for each additional 3” long radius elbow, and 7’ for each additional 3” short radius elbow.

2.Two 45 degree elbows are equivalent to one 90 degree elbow.

3.Do not include termination elbows in calculation of vent length

4.This table is applicable for elevations from sea level to 2000 ft. For higher elevations decrease vent pipe lengths by 8% per 1000 ft. of altitude.

5.Only the above pipe materials are approved for use with these condensing furnaces.

Table 5. Vent Table

Upflow Furnaces

Inlet

Exhaust

See Vent Table 5

 

 

5/8"

 

 

Seal/Caulk

 

 

 

 

 

 

 

 

 

Straps or Other Suitable

 

around Pipe

 

 

Supports at Minimum of 5 ft. Intervals

at Building

Combustion

 

 

 

90˚ Elbow

 

 

 

 

Offset with

 

 

 

 

Exhaust Pipe

 

 

 

 

for Adequate

 

 

 

 

Dimensional

 

Upward Pitch - 1/4" per Foot

12" Min.

Clearance

 

PVC or

 

Outlet Exhaust Vent

 

7"

 

First Support Placed

 

 

ABS Pipe

 

 

 

 

 

as Close to Furnace

Wall

 

 

 

Connection as Possible

 

Normal Snow Level

 

 

Exhaust Vent

 

 

 

 

 

Straight Neoprene Coupling

 

 

with 2 Hose Clamps*

 

 

 

(Optional - Not Shown)

 

 

 

Downflow Furnaces

Seal/Caulk around Pipe at Building

90˚ Elbow

12" Min.

See Vent Table 5

Straps or Other Suitable

Supports at Minimum of 5 ft. Intervals

Upward Pitch - 1/4" per Foot

Outlet Exhaust Vent

Exhaust Inlet 5/8"

Combustion Air

Inlet

Offset with Exhaust

Pipe for Adequate

Dimensional

Clearance

 

 

First Support Placed

 

Wall

as Close to Furnace

 

Connection as Possible

Normal Snow Level

 

 

Exhaust Vent

 

 

PVC or

ABS Pipe

Straight Neoprene Coupling with

2 Hose Clamps*

*These neoprene couplings are field-supplied and can be used if the installation requires breakable connections in the piping. Note that a maximum of two couplings per pipe are allowed.

Figure 16. Horizontal Venting

19

Image 19
Contents What to do if YOU Smell GAS Installation InstructionsPage Table of Contents Furnace Specifications Downflow *RL Furnace G6RC Upflow Furnace Capacities -Furnace Airflow DataCapacities Installation Requirements Requirements and Codes Safety InformationImportant Note Minimum Clearances to Combustible Material Clearances to Combustible MaterialsDownflow Warning *RL Models Horizontal InstallationsLocation Vinyl Cap Grey Tubing Circulating AIR Supply Supplyair Plenum InstallationInstallation on a concrete slab *RL Installation on a combustible floor *RLVenting and Combustion AIR Requirements Return AirFurnace on a Wood Floor Downflow Sub-Base DimensionsEquipment in a Confined Combustion Air Quality Air Requirements For One-Pipe InstallationInstallation In An Unconfined Space Installation In a Confined SpaceVenting Requirements Seal any unused openings in the vent- ing system SolutionVent Pipe Material Vent Pipe Length and DiameterDownflow Furnaces Upflow FurnacesVent Table Horizontal Venting Vent Pipe InstallationPipe Routing and Support Location of Outdoor TerminationsVertical Venting Page Vent Termination Clearances for Direct Vent Furnaces For appliances 100,00 Btuh 30 kW Vent Protection Vertical VentingVent Freezing Protection = 12 Above Roof or Snow Accumulation LevelUpflow Models Concentric Vent Termination Drainage of Condensate from FurnaceSide Wall Vent Kit Leak Check GAS Supply and PipingAbove Sea Level Manifold Pressure in WC for Natural Gas at Various AltitudesLP/Propane Gas Sea Level and High Altitude Conversion ConversionHigh Altitude Application Natural Gas High Altitude ConversionLine Voltage Wiring Electrical WiringLow Voltage Wiring Firing rate = 1040 x 90 = 93,600 Btuh START-UP and AdjustmentsStart-Up Procedure Verifying and Adjusting Firing RateBlower Speed Tap Location Verifying and Adjusting Temperature RiseGas Flow Rate Verifying Operation of the Supply Air Limit SwitchVerifying Burner Operation Description of ComponentsMaintenance WD# For Upflow and Downflow Residential FurnacesDownflow Furnace Models Upflow Furnace ModelsSystem Operation Information Heating ModeSequence of Operation Twinning of Two Furnaces Cooling ModeFan Mode Furnace Fails to OperateFuel Type INSTALLATION/PERFORMANCE Check List