Nordyne RC 92+, RL 90+ installation instructions Vertical Venting

Page 21

Upflow Furnaces

Support System on

Vertical Rise Below Joints

Support System with

 

first support as close

5'

to furnace as Possible

Combustion

Air Pipe

Exhaust

Vent

Straight Neoprene

Couplings with

2 Hose Clamps*

(Optional - Not

Shown)

Upward Pitch 1/4" per Foot

Cabinet

Furnace Front

Downflow Furnaces

Exhaust

Vent

Support System on

Vertical Rise Below Joints

Support System with

 

first support as close

5'

to furnace as Possible

 

Combustion

 

Air Pipe

 

Straight Neoprene

 

Rubber Couplings

Upward Pitch

with 2 Hose Clamps*

1/4" per Foot

Cabinet

Furnace Front

Figure 17. Vertical Venting

*These couplings are field-supplied and can be used if the installation requires breakable connec- tions in the piping. Note that a maximum of two couplings per pipe are allowed.

Upflow Furnaces

Combustion Air Inlet Pipe Collar Diameter 3" for coupling or reducer

Furnace Top

2" PVC Exhaust Vent All Models

Downflow Furnaces

Combustion Air Inlet

2" PVC on 040/060 models, 3" PVC on 080/100 models

Furnace Top

2" PVC

Exhaust Vent

All Models

Figure 18. Furnace Pipe Adaptions

21

Image 21
Contents What to do if YOU Smell GAS Installation InstructionsPage Table of Contents Furnace Specifications Downflow *RL Furnace G6RC Upflow Furnace Capacities -Furnace Airflow DataCapacities Safety Information Installation Requirements Requirements and CodesImportant Note Minimum Clearances to Combustible Material Clearances to Combustible MaterialsHorizontal Installations Downflow Warning *RL ModelsLocation Vinyl Cap Grey Tubing Installation on a concrete slab *RL Supplyair Plenum InstallationInstallation on a combustible floor *RL Circulating AIR SupplyVenting and Combustion AIR Requirements Return AirFurnace on a Wood Floor Downflow Sub-Base DimensionsEquipment in a Confined Installation In An Unconfined Space Air Requirements For One-Pipe InstallationInstallation In a Confined Space Combustion Air QualityVenting Requirements Vent Pipe Material SolutionVent Pipe Length and Diameter Seal any unused openings in the vent- ing systemUpflow Furnaces Downflow FurnacesVent Table Pipe Routing and Support Vent Pipe InstallationLocation of Outdoor Terminations Horizontal VentingVertical Venting Page Vent Termination Clearances for Direct Vent Furnaces For appliances 100,00 Btuh 30 kW Vent Protection Vertical Venting= 12 Above Roof or Snow Accumulation Level Vent Freezing ProtectionUpflow Models Drainage of Condensate from Furnace Concentric Vent TerminationSide Wall Vent Kit Leak Check GAS Supply and PipingAbove Sea Level Manifold Pressure in WC for Natural Gas at Various AltitudesHigh Altitude Application ConversionNatural Gas High Altitude Conversion LP/Propane Gas Sea Level and High Altitude ConversionElectrical Wiring Line Voltage WiringLow Voltage Wiring Start-Up Procedure START-UP and AdjustmentsVerifying and Adjusting Firing Rate Firing rate = 1040 x 90 = 93,600 BtuhBlower Speed Tap Location Verifying and Adjusting Temperature RiseVerifying Burner Operation Verifying Operation of the Supply Air Limit SwitchDescription of Components Gas Flow RateMaintenance WD# For Upflow and Downflow Residential FurnacesDownflow Furnace Models Upflow Furnace ModelsHeating Mode System Operation InformationSequence of Operation Fan Mode Cooling ModeFurnace Fails to Operate Twinning of Two FurnacesFuel Type INSTALLATION/PERFORMANCE Check List