Nordyne RL 90+, RC 92+ installation instructions GAS Supply and Piping, Leak Check

Page 28

NOTE: Industry research studies indicate that when condensate is routed to an active drain, household detergents, etc., buffer its acidity. If the drain is not actively used or if codes require, obtain a neutralizer kit (usually contains lime- stone). Proper drains and connections to the condensate tubing are required as NORDYNE cannot be held responsible for water leakage which occurs due to loose hose connections or improperly sealed drain line pipes.

GAS SUPPLY AND PIPING

This furnace is equipped for either left or right side gas entry. Typical gas service hook-ups are shown in Figure 25. When making the gas connection provide clearance between the gas supply line and the entry hole in the furnace casing to avoid unwanted noise and/or damage to the furnace.

All gas piping must be installed in compliance with local codes and utility regulations. Some local regulations require the installation of a manual main shut-off valve and ground joint union external to the furnace. The shut-off valve should be readily accessible for service and/or emergency use. Consult the local utility or gas supplier for additional requirements regarding placement of the manual main gas shut-off. In the absence of local codes the gas line instal- lation must comply with the latest edition of the National Fuel Gas Code (ANSI Z223.1) or (CAN/CGA B149) installation codes.

An 1/8” NPT plugged tap must be installed in the gas line to the unit for use when measuring the gas supply pressure. The plug should be readily accessible for service use. A drip leg should be installed in the vertical pipe run to the unit.Table 5 lists gas flow capacities for standard pipe sizes as a function of length in typical applications based on nominal pressure drop in the line.

NOTE: Gas piping must not be run in or through air ducts, chimneys, gas vents, elevator shafts, etc.

Compounds used on threaded joints of gas pip- ing must be resistant to the actions of liquefied petroleum gases.

The main manual gas valve and main power dis- connect to the furnace must be properly labeled by the installer in case emergency shutdown is required.

!CAUTION:

Do not use matches, lighters, candles, or other sources of open flame to check for gas leaks.

Leak Check

!WARNING:

FIRE OR EXPLOSION HAZARD

Failure to follow the safety warnings exactly could result in serious injury, death or property damage.

Never test for gas leaks with an open flame. Use a commercially available soap solution made specifically for the detection of leaks to check all connec- tions. A fire or explosion may result causing property damage, personal injury or loss of life.

After the gas piping to the furnace is complete, all connections must be tested for gas leaks. To check for leaks use only a soap and water solution or other approved method.

IMPORTANT NOTE: When pressure testing gas supply lines at pressures greater than 1/2 psig (14 in. water column), the furnace must be disconnected from the gas supply piping system to prevent damage to the gas control valve. If the test pressure is less than or equal to 1/2 psig (14 in. water column), the furnace must be isolated from the gas supply line by closing the manual shut-off valve.

!WARNING:

This furnace was equipped at the factory for use with natural gas only. A special kit, supplied by the manu- facturer, is required to convert the furnace to operate on LP/propane gas. Failure to use the proper conversion kit can cause fire, explosion, property damage, carbon monoxide poisoning, personal injury, or death.

28

Image 28
Contents Installation Instructions What to do if YOU Smell GASPage Table of Contents Furnace Specifications Downflow *RL Furnace Capacities -Furnace Airflow Data G6RC Upflow FurnaceCapacities Installation Requirements Requirements and Codes Safety InformationImportant Note Clearances to Combustible Materials Minimum Clearances to Combustible MaterialDownflow Warning *RL Models Horizontal InstallationsLocation Vinyl Cap Grey Tubing Supplyair Plenum Installation Installation on a concrete slab *RLInstallation on a combustible floor *RL Circulating AIR SupplyReturn Air Venting and Combustion AIR RequirementsDownflow Sub-Base Dimensions Furnace on a Wood FloorEquipment in a Confined Air Requirements For One-Pipe Installation Installation In An Unconfined SpaceInstallation In a Confined Space Combustion Air QualityVenting Requirements Solution Vent Pipe MaterialVent Pipe Length and Diameter Seal any unused openings in the vent- ing systemDownflow Furnaces Upflow FurnacesVent Table Vent Pipe Installation Pipe Routing and SupportLocation of Outdoor Terminations Horizontal VentingVertical Venting Page Vent Termination Clearances for Direct Vent Furnaces For appliances 100,00 Btuh 30 kW Vertical Venting Vent ProtectionVent Freezing Protection = 12 Above Roof or Snow Accumulation LevelUpflow Models Concentric Vent Termination Drainage of Condensate from FurnaceSide Wall Vent Kit GAS Supply and Piping Leak CheckManifold Pressure in WC for Natural Gas at Various Altitudes Above Sea LevelConversion High Altitude ApplicationNatural Gas High Altitude Conversion LP/Propane Gas Sea Level and High Altitude ConversionLine Voltage Wiring Electrical WiringLow Voltage Wiring START-UP and Adjustments Start-Up ProcedureVerifying and Adjusting Firing Rate Firing rate = 1040 x 90 = 93,600 BtuhVerifying and Adjusting Temperature Rise Blower Speed Tap LocationVerifying Operation of the Supply Air Limit Switch Verifying Burner OperationDescription of Components Gas Flow RateMaintenance For Upflow and Downflow Residential Furnaces WD#Upflow Furnace Models Downflow Furnace ModelsSystem Operation Information Heating ModeSequence of Operation Cooling Mode Fan ModeFurnace Fails to Operate Twinning of Two FurnacesINSTALLATION/PERFORMANCE Check List Fuel Type