Cisco Systems CGS 2520 manual Installation Guidelines, Installing a Power Supply Module

Page 53

Chapter 3 Power Supply Installation

Power Supply Module Installation

Installation Guidelines

Observe these guidelines when removing or installing a power supply module:

A power supply module that is only partially connected to the switch disrupts the system operation.

Warning Blank faceplates and cover panels serve three important functions: they prevent exposure to hazardous voltages and currents inside the chassis; they contain electromagnetic interference (EMI) that might disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not operate the system unless all cards, faceplates, front covers, and rear covers are in place. Statement 1029

Note You can order the blank cover (part number RPS-CG-COVER=).

Warning Do not reach into a vacant slot while installing or removing a module. Exposed circuitry is an energy hazard. Statement 206

Warning Only trained and qualified personnel should be allowed to install, replace, or service this equipment. Statement 1030

Warning Do not work on the system or connect or disconnect cables during periods of lightning activity. Statement 1001

Installing a Power Supply Module

This procedure is for installing a power supply module in the PSU1 or PSU2 slot.

Warning The covers are an integral part of the safety design of the product. Do not operate the unit without the covers installed. Statement 1077

Warning This unit might have more than one power supply connection. All connections must be removed to de-energize the unit. Statement 1028

Caution Equipment installation must comply with local and national electrical codes.

Equipment That You Need

Ratcheting torque flathead screwdriver that exerts up to 15-inch pound (in-lb) of torque

Ring, spade, or flanged spade terminal

Cisco CGS 2520 Hardware Installation Guide

 

OL-31444-01

3-3

 

 

 

Image 53
Contents Cisco CGS 2520 Hardware Installation Guide Page N T E N T S Wall-Mounting Troubleshooting Accessing the CLI Through the Console Port C-1 Preface Related Publications Obtaining Documentation and Submitting a Service RequestProduct Overview Model Description Switch ModelsCable Side Cisco CGS-2520-16S-8PC Cable-Side View PortsPoE and PoE+ Ports 10/100BASE-T PortsSFP Modules Dual-Purpose Gigabit Ethernet PortsType of SFP Module Model SFP Module Patch CableAlarm Ports Power-Input TerminalAlarm Input Alarm OutputManagement Ports LEDsColor System Status Switch Panel LEDsSystem LED Console LEDs Power Supply Module LEDsAlarm LEDs PoE LED Port LEDsColor Description LED Color MeaningSD Flash Memory Card Power Supply SideDual-Purpose Port LEDs SD Flash Memory Card LEDPSU OK LED Power Supply Features Power Supply-Side LEDsManagement Options Network Configurations Switch Installation 140F 60C Statement 75 in .4 cm. Statement Installation GuidelinesVerifying Switch Operation Mounting Brackets Installing the SwitchMounting into a Rack 2shows the 23-inch rack mounting brackets Attaching Brackets for 19-Inch RacksAttaching Brackets for 19-Inch Racks Attaching Brackets for 19-Inch Racks IP-30 Compliance Inserting the Rubber Plugs Inserting the Rubber Plugs Inserting the Rubber Plugs detail Attaching Brackets for 19-Inch Racks 10 Attaching Brackets for 19-Inch Racks Attaching Brackets for 23-Inch Racks11 Attaching Brackets for 23-Inch Racks Attaching Brackets for Etsi Racks12 Attaching Brackets for Etsi Racks Mounting the Switch into a Rack Attaching Brackets for Wall Mounting Wall-Mounting14 Attaching 19-inch Rack Brackets for Wall Mounting Wall-Mounting for IP-30 Compliance15 Inserting the Rubber Plugs into the Switch Holes Installing SFP Modules Installing and Removing SFP ModulesRemoving SFP Modules 17 Installing an SFP Module18 Removing a Bale Clasp Latch SFP Module Inserting and Removing the SFP Module Patch CableRemoving the SFP Module Patch Cable Replacing the SD Flash Memory Card21 Loosening the Captive Screw Device Crossover Cable Straight-Through Cable Connecting Devices to the Ethernet PortsConnecting to the 10/100 PoE+ Ports Connecting to the 10/100 and 10/100/1000 Ports Where to Go Next Power Supply Modules Power Supply InstallationPWR-RGD-AC-DC Power Supply Module Power Supply Module InstallationEquipment That You Need Installation GuidelinesInstalling a Power Supply Module Grounding the Switch Dual-hole terminal lug Loosen the Screws on the Power Supply Blank Installing the Power Supply Module in the SwitchAC 5 A, DC 15 a Statement Wiring the Power SourcePSU2 11 Stripping the Input Power Source Wire 12 Crimping the Spade Terminal Lug AC power Removing the Power Supply Module15 Removing the Screws Switch LEDs Diagnosing ProblemsSwitch Post Results Bad or Damaged Cable Switch ConnectionsEthernet and Fiber-Optic Cables Link StatusSFP Module 10/100 and 10/100/1000 Port Connections10/100 PoE+ Port Connections Interface Settings Switch PerformancePing End Device Spanning Tree LoopsCabling Distance Auto-Negotiation and Network Interface CardsFinding the Switch Serial Number Resetting the Switch to the Factory Default SettingsEnvironmental Ranges Switch SpecificationsPhysical Specifications Power Requirements Power Requirements Power Specifications Power Supply Module Specifications10/100 Ethernet Ports Connector SpecificationsFigure B-2 Fiber-Optic SFP Module LC Connector SFP Module ConnectorsDual-Purpose Ports Alarm PortAlarm Ratings SFP Module Cables Cables and AdaptersIndustrial and Rugged SFPs Commercial SFPs100BASE-BX Cable Pinouts Extended temperature SFPsFigure B-6 DSR DTR CTS RTS Console Port Adapter PinoutsSwitch Console RJ-45-to-DB-25 Port DTE Adapter Device OL-31444-01 RJ-45 Console Port Accessing the CLI Through the Console PortFigure C-1 Connecting the Console Cable USB Console Port Figure C-2 Connecting the USB Console CableInstalling the Cisco Microsoft Windows 2000 USB Driver Installing the Cisco Microsoft Windows USB Device DriversInstalling the Cisco Microsoft Windows XP USB Driver Installing the Cisco Microsoft Windows Vista USB Driver Uninstalling the Cisco Microsoft Windows USB DriversUninstalling the Cisco Microsoft Windows Vista USB Driver Entering the Initial Configuration InformationIP Settings Completing the Setup Program These choices appear