5.Place the flashing over the pipe section(s) extending through the roof. Secure the base of the flashing to the roof and framing with roof- ing nails. Be sure roofing material overlaps the top edge of the flashing as shown in Figure 19, page 14. There must be a 1" clearance from the vent pipe to combustible materials.

6.Continue to add pipe sections until the height of the vent cap meets the minimum building code requirements described in Figure 7 on page 7. Note: You must increase vent height for steep roof pitches. Nearby trees, adjoining rooflines, steep pitched roofs and other similar factors may cause poor draft or down-drafting in high winds. Increasing the vent height may solve this problem.

7.Twist-lock the vent cap onto the last section of vent pipe.

Note: If the vent pipe passes through any occupied areas above the first floor, including storage spaces and closets, you must enclose pipe. You may frame and sheetrock the enclosure with standard construction material. Make sure and meet the minimum allowable clearances to combustibles. Do not fill any of the required air spaces with insulation.

Vertical Termination Configurations Figures 21 through 24 show four different con- figurations for vertical termination.

Venting with Two 90° Elbows

Horizontal (H1) +

Vertical (V) Horizontal (H2)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

45° Elbow

 

Note: Install restrictor into inner collar of fireplace as shown.

Figure 21 - Vertical Venting

Configuration Using Two 90° Elbows

with Two Horizontal Runs (Vertical

Round High Wind Termination Shown)

Venting with One 90° Elbow

Vertical (V)

Horizontal (H)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

 

45° Elbow

Note: Install restrictor into inner collar of fireplace as shown.

Figure 22 - Vertical Venting

Configuration Using One 90° Elbow

(Vertical Round High Wind Termination

Shown)

111250-01E

www.desatech.com

15

Image 15
Contents What to do if YOU Smell GAS Safety Information Table of ContentsSafety Information High traffic areas Product FeaturesLocal Codes Product IdentificationProper clearances must be maintained Pre-Installation PreparationLocation and space requirements This fireplace does not require electricity to operateVenting clearances ClearancesFraming and finishing Front Top of Standoffs Vent See ventingBalcony with Perpendicular Side Wall Location of Termination CapInstallation Precautions Venting Installation InstructionsInstallation Planning Installing Horizontal Vent Cap Noncombustible Exterior 32 min Ground Floor InstallationRecommended Applications Corner ground floor installation Snorkel Termination InstallationHorizontal System Installation Using TWO 90 Elbows Installation for vertical termination Flat Ceiling InstallationConnect a section of pipe and extend up through the hole Twist-lock the vent cap onto the last section of vent pipe Vertical Venting High Altitude InstallationNumber Description Desa Venting AccessoriesDesa Elbows Desa TerminationsCheck GAS Type Fireplace InstallationInstalling optional blower accessories Model BK InstallationPlug in blower power cord to duplex outlet Model BKT InstallationInstalling Gas Piping to Fireplace Location Blower Wiring DiagramInstallation Items Needed Checking GAS Connections Connecting Fireplace to GAS SupplyTest Pressures Equal To or Less Than Psig 3.5 kPa Pressure Testing Fireplace Gas ConnectionsInstalling optional wall mount switch GWMS2 Installing Remote ReceiverOpen bottom louver and locate the switch Removing Glass Door Cleaning Glass DoorRemoving/Replacing Glass Door Removing Louver PanelsClose top and bottom louvers Installing logs, lava rock and glowing embersInstalling Log No To Turn OFF GAS To Appliance For your safety Read before lightingOperating Fireplace Lighting InstructionsRemote Operation Manual Lighting ProcedureOptional Hand-Held On/Off Series Models HRC100 and HRC101Operating optional GWMT1 Wall Mounted Thermostat Operating optional blower accessorySafety Features Auto Shutoff FeatureBurner Flame Pattern Cleaning MaintenancePilot Assembly Inspecting BurnersPilot and burners LogsVenting system Observed Problem Possible Cause Remedy TroubleshootingAfter pilot lights, keep gas Mocouple to cool, causingProblem could be caused by Replace pilot assembly Burner orifice clogged Clean burner see Cleaning Is litTery power is low When burner is litDirty or partially clogged 3. Clean burner see Cleaning Or shut off Service person Remote does not functionStatement above Gas leak. See WarningSpecifications Replacement PartsService Hints Technical ServiceDeflection hood Wall mounted on/off switch gwms2 Not ShownFace/Louver Panel kit Rolled Louver Trim kitIllustrated Parts Breakdown Left Refractory Brick Panel Rear Refractory Brick PanelIllustrated Parts Breakdown 11102 111250-01E 111250-01E Warranty Information Keep this WarrantyLimited Warranty DIRECT-VENT Fireplace

(V)T36NA specifications

Desa (V)T36NA is an advanced piece of machinery designed primarily for heavy-duty applications in various industrial sectors. Known for its reliability and efficiency, this model has gained popularity among operators seeking high performance without compromising on durability.

One of the standout features of the Desa (V)T36NA is its powerful engine. It is equipped with a state-of-the-art internal combustion engine that provides robust torque and horsepower, enabling it to tackle demanding tasks with ease. This power is complemented by a highly efficient fuel system that minimizes consumption, making it both cost-effective and environmentally friendly.

The Desa (V)T36NA incorporates cutting-edge technologies that enhance its operational capabilities. Its intelligent control system allows for seamless adjustments to power settings based on task requirements. This feature not only improves performance but also extends the lifespan of the machinery by preventing overexertion. Additionally, the unit is integrated with advanced diagnostic tools that monitor performance metrics, enabling operators to identify issues before they escalate.

Another notable characteristic of the Desa (V)T36NA is its robust construction. Built from high-grade materials, this machinery is designed to withstand the rigors of tough industrial environments. The frame is reinforced to handle heavy loads and resist wear and tear, which significantly reduces maintenance costs over time.

In terms of ergonomics, the machinery is designed with user comfort in mind. The operator's cabin is spacious, providing ample room and visibility for enhanced maneuverability. The controls are intuitively laid out, ensuring that operators can make adjustments quickly and efficiently.

The Desa (V)T36NA also emphasizes safety, featuring advanced safety mechanisms such as automatic braking systems and secure cabin enclosures. These features protect both the operator and the surrounding personnel, making it a reliable choice for any workspace.

Overall, the Desa (V)T36NA represents a significant advancement in heavy machinery, combining power, efficiency, and safety in one robust package. Its innovative technologies and solid construction make it an excellent investment for industries seeking to enhance productivity while ensuring operator comfort and safety. Whether in construction, manufacturing, or other heavy-duty applications, the Desa (V)T36NA stands out as a trustworthy ally in achieving operational goals.