Desa (V)T36NA installation manual Twist-lock the vent cap onto the last section of vent pipe

Page 15

Venting Installation

instructions

Continued

5.Place the flashing over the pipe section(s) extending through the roof. Secure the base of the flashing to the roof and framing with roof- ing nails. Be sure roofing material overlaps the top edge of the flashing as shown in Figure 19, page 14. There must be a 1" clearance from the vent pipe to combustible materials.

6.Continue to add pipe sections until the height of the vent cap meets the minimum building code requirements described in Figure 7 on page 7. Note: You must increase vent height for steep roof pitches. Nearby trees, adjoining rooflines, steep pitched roofs and other similar factors may cause poor draft or down-drafting in high winds. Increasing the vent height may solve this problem.

7.Twist-lock the vent cap onto the last section of vent pipe.

Note: If the vent pipe passes through any occupied areas above the first floor, including storage spaces and closets, you must enclose pipe. You may frame and sheetrock the enclosure with standard construction material. Make sure and meet the minimum allowable clearances to combustibles. Do not fill any of the required air spaces with insulation.

Vertical Termination Configurations Figures 21 through 24 show four different con- figurations for vertical termination.

Venting with Two 90° Elbows

Horizontal (H1) +

Vertical (V) Horizontal (H2)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

45° Elbow

 

Note: Install restrictor into inner collar of fireplace as shown.

Figure 21 - Vertical Venting

Configuration Using Two 90° Elbows

with Two Horizontal Runs (Vertical

Round High Wind Termination Shown)

Venting with One 90° Elbow

Vertical (V)

Horizontal (H)

5' min.

2' max.

6' min.

4' max.

7' min.

6' max.

8' min.

8' max.

20' max.

8' max.

 

45° Elbow

Note: Install restrictor into inner collar of fireplace as shown.

Figure 22 - Vertical Venting

Configuration Using One 90° Elbow

(Vertical Round High Wind Termination

Shown)

111250-01E

www.desatech.com

15

Image 15
Contents What to do if YOU Smell GAS Safety Information Table of ContentsSafety Information High traffic areas Product FeaturesLocal Codes Product IdentificationProper clearances must be maintained Pre-Installation PreparationLocation and space requirements This fireplace does not require electricity to operateVenting clearances ClearancesFraming and finishing Front Top of Standoffs Vent See ventingBalcony with Perpendicular Side Wall Location of Termination CapInstallation Precautions Venting Installation InstructionsInstallation Planning Installing Horizontal Vent Cap Noncombustible Exterior 32 min Ground Floor Installation Recommended Applications Corner ground floor installation Snorkel Termination InstallationHorizontal System Installation Using TWO 90 Elbows Installation for vertical termination Flat Ceiling InstallationConnect a section of pipe and extend up through the hole Twist-lock the vent cap onto the last section of vent pipe Vertical Venting High Altitude InstallationNumber Description Desa Venting AccessoriesDesa Elbows Desa TerminationsCheck GAS Type Fireplace InstallationInstalling optional blower accessories Model BK InstallationPlug in blower power cord to duplex outlet Model BKT InstallationInstalling Gas Piping to Fireplace Location Blower Wiring DiagramInstallation Items Needed Checking GAS Connections Connecting Fireplace to GAS SupplyTest Pressures Equal To or Less Than Psig 3.5 kPa Pressure Testing Fireplace Gas ConnectionsInstalling optional wall mount switch GWMS2 Installing Remote ReceiverOpen bottom louver and locate the switch Removing Glass Door Cleaning Glass DoorRemoving/Replacing Glass Door Removing Louver PanelsClose top and bottom louvers Installing logs, lava rock and glowing embersInstalling Log No To Turn OFF GAS To Appliance For your safety Read before lightingOperating Fireplace Lighting InstructionsRemote Operation Manual Lighting ProcedureOptional Hand-Held On/Off Series Models HRC100 and HRC101Operating optional GWMT1 Wall Mounted Thermostat Operating optional blower accessorySafety Features Auto Shutoff FeatureBurner Flame Pattern Cleaning MaintenancePilot Assembly Inspecting BurnersPilot and burners LogsVenting system Observed Problem Possible Cause Remedy TroubleshootingAfter pilot lights, keep gas Mocouple to cool, causingProblem could be caused by Replace pilot assembly Burner orifice clogged Clean burner see Cleaning Is litTery power is low When burner is litDirty or partially clogged 3. Clean burner see Cleaning Or shut off Service person Remote does not functionStatement above Gas leak. See WarningSpecifications Replacement PartsService Hints Technical ServiceDeflection hood Wall mounted on/off switch gwms2 Not ShownFace/Louver Panel kit Rolled Louver Trim kitIllustrated Parts Breakdown Left Refractory Brick Panel Rear Refractory Brick PanelIllustrated Parts Breakdown 11102 111250-01E 111250-01E Warranty Information Keep this WarrantyLimited Warranty DIRECT-VENT Fireplace