Trace Oxygen Analyzer | Operations 4 |
|
|
|
|
1)At
2)Operate the analyzer for 24 hours and compare the electrolyte level with the “reference” established in Step 1. If the level is lower than the reference, adjust the knob a few divisions clockwise; if higher, adjust a few divisions counterclockwise.
3)Operate another 24 hours and repeat Step 2.
4)Continue adjustments at
Once the analyzer is suitably located, all components serviced and installed, and sample and electrical connections made, the instrument is ready for operation.
4.5Power
When power is turned on, power is applied to the cell compartment heater. The cell operates without applied power, but its output will vary with changes in ambient temperature.
4.6Warm-Up and Stabilization
When the analyzer is initially put into operation, the air in the lines and sample passages will drive the output indication to the top of the scale. The time required to sweep out this residual air may be several hours before an
4.7Calibration
The analyzer is calibrated by adding a known amount of oxygen into the analyzer by means of a calibrated span gas. The sensitivity of the ana- lyzer is adjusted until the change indicated by the analyzer is equal to the amount of oxygen known to be present in the span gas. The span gas must be composed of the same elements as the specified sample gas if the analyzer's calibrated flowmeter is to be used. TBE/AI recommends that the oxygen content of the span gas be between