Graham Field Mp717404 Ccessory Assembly Head & Foot Half Rails, Head-End Half Rail KIT ZA78400

Page 20

Accessory Assembly - Head & Foot Half Rails

Head-End Half Rail KIT: ZA78400

(Includes part 999-0784-908G —Left side and

part 999-0784-907G - right side, plus hardware bag)

HeAd

right

Left

Foot

HEAD

BOARD

note: release trigger is located at this end.

LeFt HALF rAIL

999-0784-908G sHoWn

Item #

Qty.

Part #

Description

 

 

 

 

 

 

 

Head-End Half Rail: Left-Hand Side - 76”

1

1

999-0784-908G

Head-End Half Rail: Left-Hand Side - 80”

 

 

 

 

 

 

 

Foot-End Half Rail: Right-Hand Side - 80” Only (Not shown)

 

 

 

 

1

1

999-0794-908G

Foot-End Half Rail: Right-Hand Side - 76” Only (Not shown)

 

 

 

 

 

 

 

Foot-End Half Rail: Left-Hand Side - 80” Only (Pg. 18)

 

 

 

 

1

1

999-0784-907G

Head-End Half Rail: Right-Hand Side - 76” (Not shown)

 

 

 

 

 

 

 

Head-End Half Rail: Right-Hand Side - 80” (Not shown)

 

 

 

 

1

1

999-0794-907G

Foot-End Half Rail: Left Hand Side - 76” Only (Pg. 18)

 

 

 

 

 

 

 

Clevis Pin - 16mm. Dia. x 105mm. w/cross-hole,

2

2

999-0784-100

circle cotter, lanyard cable (LBK-3-06)

 

 

 

and Hair Pin Clip

 

 

 

 

1.All Half Rails (#1) mount to the bed in a similar fashion. Left or right designations are based on the patient’s orientation as he/she lies in the bed.

2.Insert the two Clevis Pins, with Circle Cotter and Lanyard Cable (#2), into the two Half Rail arms as shown.

3.Attach the Half Rail to the bed frame brace by aligning the arms and Clevis Pins to the holes on the brace. Slide the Clevis Pins so that they extend past the brace on the underside of the bed.

4.Insert the two Hair Pin Clips (#3) into the holes in the Clevis Pins to secure the rail to the bed.

!WARNING: The mattress support platform should always be placed in the flat position when not attended.

5.IMPORTANT: Lubricate all pivot joints as needed. Aerosol White Lithium Grease is recommended.

When assessing the Risk for Entrapment, you need to consider your bed, mattress, head- and footboards, half rails, assist bars, and other accessories as an entire system. All bed systems are evaluated for compliance to the FDA/CDRH “Hospital Bed System Dimensional and Assessment Guidance to Reduce Entrapment” guidelines.

6.TO OPERATE: Depress the Release Trigger to lower or raise the half rail assembly.

A resident/patient’s condition could lead to resident/patient entrapment. It is extremely important to review the resident/patient’s physical and mental condition, and initiate an appropriate individual care plan to address any entrapment risks.

NO SPECIAL Tools REQUIRED

Basic American Medical products, a division of GF Health products, Inc. • Matrix II • rev d Manual

p17

Image 20
Contents Page Important notIce Able of Contents Afety & Warning Information please read before operation Ntrapment compliance information ED features & Specifications FeaturesOsitioning Specifications Quick ReferencePeration of Standard PENDANT/HAND Controller Easy Patient ControlsPeration of Optional STAFF/NURSE Control HEAD- & Footboards Standard Headboard and Footboard Boring Diagram Ssembly standard head and foot boards Standard Headboard and Footboard Assembly Staff CONTrOL ASSEMBLy KIT ZL788053 INCLuDES Ssembly Optional foot board Embedded Staff ControlWALLSAVERS, Mattress Retainers Edema Ratchets Ssembly standard wallsaver with optional trapeze positioning Ssembly standard corner mattress retainers RequiredPeration of Optional Edema Foot Ratchet Foot-end rAtcHet FuLL-doWn posItIon FuLL-up posItIonAccessory Assembly Ccessory Assembly Head & Foot Half Rails Head-End Half Rail KIT ZA78400FOOT-End Half Rail KIT ZA78500 Ccessory Assembly Foot Rail Bracket for Half Rails For 2 Half Rail Foot Brackets Order Hardware Bag/KitCcessory Assembly Foot-END Assist BAR OptIon 1Ccessory Assembly HEAD-END Assist BAR Ccessory Assembly standard 4 extension pan Kit Assembly INSTRucTIONSCcessory Assembly 42 wide deck order Kit# ZA811000 Item # Qty DescriptionCcessory Assembly 4 wide deck extension pan KIT Standard KIT #ZA82100 Includes Items 1Ccessory Assembly Trapeze support Assembly Kit#Parts & Hardware Ssembly of HEAD, KNEE, & Foot Decks to Main Frame Ssembly of Main Frame to U-LEVERS and Drag Link Ssembly of U-LEVERS to STD. Caster Carriage 999-0807-955G Ssembly of U-LEVERS to Locking Caster Carriage 999-0807-958G Electronics Ssembly of Head ACTUATOR/MOTOR to Head Deck & Frame Ssembly of Foot ACTUATOR/MOTOR to Knee Deck & Frame Knee DeckSsembly of HI/LO ACTUATOR/MOTOR to Drag Link & U-LEVER Cabling Ontrol BOX Cabling Connections & cables SInGLe controL BoXEad motor Cabling 999-0778-204 Viewed from Bottom ILO motor Cabling 999-0775-202 viewed from Bottom Oot motor Cabling 999-0775-201 Viewed from Bottom Endant Cabling 999-0775-305 & 999-0779-200 from Bottom Power cORD ROuTING with cABLE Ties Ower Cord Cabling 999-0775-208 Viewed from BottomLectronic Troubleshooting Event Possible solutionsEcommended Maintenance & Inspection Schedules Mechanical Inspection of assemblies 6 monthsOtes