Graham Field MM7074, Mp7074, Mp7114, MM7114, Mp7174 Ssembly of Main Frame to U-LEVERS and Drag Link

Page 31

ASSEMBLY OF MAIN FRAME TO U-LEVERS AND DRAG LINK

Item #

Qty.

Part #

Description

 

 

 

 

1

1

999-0807-900G

Main Frame Weldment

 

 

 

 

2

1

999-0807-903G

Foot U-Lever Weldment

 

 

 

 

3

1

999-0807-913G

Head U-Lever Weldment

 

 

 

 

4

1

999-0807-906G

Drag Link Weldment

 

 

 

 

5

4

999-0779-100

1/2-13” x 2.50” Shoulder Bolt

 

 

 

 

6

8

100-8601-001

.516ID x 1.25OD x .062Thk Washer

 

 

 

 

7

4

100-6750-006

1/2-13 Low Nylon Lock Nut

 

 

 

 

Item #

Qty.

Part #

Description

 

 

 

 

8

2

100-7950-005

.50” x 1.75” Clevis Pin w/Hole

 

 

 

 

9

2

100-7500-015

.50” Reg. .62 Rue Ring

 

 

 

 

10

4

999-0775-001

Half Moon Cap

 

 

 

 

11

6

100-4700-017

1.00” x 2.00” Rect. Tube End Cap

 

 

 

 

12

4

100-4700-015

1.00” Square Tube End Cap

 

 

 

 

13

2

100-8600-015

1.00” x .25” Thk Duopreen Disk

 

 

 

 

14

4

100-4550-010

Button Stop

 

 

 

 

Basic American Medical products, a division of GF Health products, Inc. • Matrix II • rev d Manual

p28

Image 31
Contents Page Important notIce Able of Contents Afety & Warning Information please read before operation Ntrapment compliance information Features ED features & SpecificationsQuick Reference Ositioning SpecificationsEasy Patient Controls Peration of Standard PENDANT/HAND ControllerPeration of Optional STAFF/NURSE Control HEAD- & Footboards Standard Headboard and Footboard Boring Diagram Ssembly standard head and foot boards Standard Headboard and Footboard Assembly Ssembly Optional foot board Embedded Staff Control Staff CONTrOL ASSEMBLy KIT ZL788053 INCLuDESWALLSAVERS, Mattress Retainers Edema Ratchets Ssembly standard wallsaver with optional trapeze positioning Required Ssembly standard corner mattress retainersFoot-end rAtcHet FuLL-doWn posItIon FuLL-up posItIon Peration of Optional Edema Foot RatchetAccessory Assembly Head-End Half Rail KIT ZA78400 Ccessory Assembly Head & Foot Half RailsFOOT-End Half Rail KIT ZA78500 For 2 Half Rail Foot Brackets Order Hardware Bag/Kit Ccessory Assembly Foot Rail Bracket for Half RailsOptIon 1 Ccessory Assembly Foot-END Assist BARCcessory Assembly HEAD-END Assist BAR Assembly INSTRucTIONS Ccessory Assembly standard 4 extension pan KitItem # Qty Description Ccessory Assembly 42 wide deck order Kit# ZA811000Standard KIT #ZA82100 Includes Items 1 Ccessory Assembly 4 wide deck extension pan KITAssembly Kit# Ccessory Assembly Trapeze supportParts & Hardware Ssembly of HEAD, KNEE, & Foot Decks to Main Frame Ssembly of Main Frame to U-LEVERS and Drag Link Ssembly of U-LEVERS to STD. Caster Carriage 999-0807-955G Ssembly of U-LEVERS to Locking Caster Carriage 999-0807-958G Electronics Ssembly of Head ACTUATOR/MOTOR to Head Deck & Frame Knee Deck Ssembly of Foot ACTUATOR/MOTOR to Knee Deck & FrameSsembly of HI/LO ACTUATOR/MOTOR to Drag Link & U-LEVER Cabling SInGLe controL BoX Ontrol BOX Cabling Connections & cablesEad motor Cabling 999-0778-204 Viewed from Bottom ILO motor Cabling 999-0775-202 viewed from Bottom Oot motor Cabling 999-0775-201 Viewed from Bottom Endant Cabling 999-0775-305 & 999-0779-200 from Bottom Ower Cord Cabling 999-0775-208 Viewed from Bottom Power cORD ROuTING with cABLE TiesEvent Possible solutions Lectronic TroubleshootingMechanical Inspection of assemblies 6 months Ecommended Maintenance & Inspection SchedulesOtes