Emerson 6081-P instruction manual Section Return of Material, General

Page 59

MODEL 6081-P pH/ORP

SECTION 12.0

 

RETURN OF MATERIALS

SECTION 12.0

RETURN OF MATERIAL

12.1 GENERAL.

To expedite the repair and return of instruments, proper communication between the customer and the factory is important. Call 1-949-757-8500 or 1-800-854-8257 for a Return Materials Authorization (RMA) number.

12.2 WARRANTY REPAIR.

The following is the procedure for returning instru- ments still under warranty:

1.Call Rosemount Analytical for authorization.

2.To verify warranty, supply the factory sales order number or the original purchase order number. In the case of individual parts or sub-assemblies, the serial number on the unit must be supplied.

3.Carefully package the materials and enclose your “Letter of Transmittal” (see Warranty). If possible, pack the materials in the same manner as they were received.

4.Send the package prepaid to:

Emerson Process Management

Liquid Division

2400 Barranca Parkway

Irvine, CA 92606

Attn: Factory Repair

RMA No. ____________

Mark the package: Returned for Repair

Model No. ____

12.3 NON-WARRANTY REPAIR.

The following is the procedure for returning for repair instruments that are no longer under warranty:

1.Call Rosemount Analytical for authorization.

2.Supply the purchase order number, and make sure to provide the name and telephone number of the individual to be contacted should additional information be needed.

NOTE

Consult the factory for additional informa- tion regarding service or repair.

NOTE: REMOVE POWER MODULE

Prior to return shipping Model 6081, remove the power module and replace the transmitter rear cover

DO NOT RETURN SHIP THE POWER MODULE to Rosemount Analytical. Keep them for proper disposal as a hazardous material.

49

Image 59
Contents Model 6081-P Essential Instructions Shipping considerations for wireless products Power ModulesAbout This Document Quick Start Guide Hart PollAddress Menu Tree for Model 6081 pH Wireless Transmitter Model 6081-P pH/ORP Table of Contents CONT’D Iii List of FiguresNumber Title This page left blank intentionally Specifications General Section Description and SpecificationsFeatures and Applications PH Range 0 to Specifications WirelessFunctional Specifications Measurement update rate 1/sec. to 1/10 minFCC and IC Hart CommunicationsTelecommunication Compliance Asset Management Solutions Unpacking and Inspection Section InstallationConsiderations Preamplifier Location PRE-INSTALLATION SetupTemperature Element Reference Electrode ImpedanceSection Mounting on a Flat Surface Pipe Mounting Installing the Power Module Power Module InstallationSection This page left blank intentionally General Information Section Sensor WiringSensor Wiring This page left blank intentionally This page left blank intentionally Section Intrinsically Safe InstallationThis page left blank intentionally Network Communications Device Network ConfigurationSection Commissioning Verify Operation Screen B Section Display and OperationDisplay Screen a Screen CInformation Screen Messages KeypadHow the Security Code Works SecurityThis page left blank intentionally Section Operation with Model Off-line and On-line Operation Making Hart related settings from the keypadGeneral Changing START-UP SettingsSection Programming the Transmitter Definitions Choosing and Configuring the Analytical MeasurementPurpose Choose Soln Temp Corr or Sensor Isoptntl Choose MeasurementPurpose Choose Calib or Config Setting a Security CodeProcedure Setting a security code Choose ResetTransmitter Making Hart Related SettingsResetting Factory Calibration and Factory Default Settings Procedure Installing default settingsProcedure Changing screen contrast Selecting a Default Screen and Screen ContrastProcedure Choosing a display screen Choose Default DisplayProcedure Programming the display timeout Choosing a Display TimeoutIntroduction Section Calibration TemperatureCalibrating Temperature Procedure Calibration pH and ORP SectionCalibration Slope and Offset Choose BufferCal Procedure Auto Buffer CalibrationProcedure Manual TWO-POINT Buffer Calibration Choose Standardize Procedure StandardizationProcedure Entering a Known Slope Value ORP Calibration Preparation of ORP standard solutionsThis page left blank intentionally Overview Section MaintenanceTransmitter Maintenance Cleaning Procedures Frequency of CleaningRejuvenating Reference Electrodes Checking the Reference ElectrodeCalibration Frequency ORP Sensor MaintenanceCalibration GeneralPower Module Replacement Shipping Considerations Handling ConsiderationsEnvironmental Considerations General Section Return of MaterialThis page left blank intentionally Warranty Specifications subject to change without notice
Related manuals
Manual 16 pages 28.1 Kb