Nortel Networks 4070 quick start Installation

Page 28

28Installation

3Extend the slide rails fully from the server rack until they lock. Align the tabs on the slide rails with the matching inserts on the device (1) and lower the server onto the slide rails.

Ensure that each slide rail tab is inserted in the matching insert on the server and that the server is resting on the top edge of the slide rail.

4Carefully slide the device along the slide rails approximately 2.54 centimeters (1 inch) toward the server rack to lock the device on the slide rails. When the device is locked in position, an indicator (1) is visible on each side of the device. Ensure that the device is securely attached to the slide rail hooks (2).

To remove the device from the rack, lift up on the indicator and slide the server forward.

Nortel Secure Network Access

Installation — Quick Start Switch 4070

NN47230-303 01.01 Standard

2.0 28 July 2008

Copyright © 2008, Nortel Networks

Image 28
Contents Installation Quick Start Switch Legal Notice Contents Installation Regulatory Information and Safety Precautions International Regulatory Statements of ConformityIces statement Canada only CE marking statement Europe onlyEN 55022 statement EN 55024 statementNational Safety Statements of Compliance EN 60950 statement Vcci statement Japan/Nippon onlyMIC notice Republic of Korea only NOM statement Mexico onlyDenan statement Japan/Nippon only Información NOM unicamente para MéxicoNational Environmental Statements of Compliance Weee Directive Compliance StatementRegulatory Information and Safety Precautions Trademarks TrademarksRegulatory Information and Safety Precautions Software license Nortel Networks software license agreementGeneral Nortel Networks software license agreement Software license New in this release FeaturesOther changes New in this release Prerequisites IntroductionNavigation Introduction Installation preparation Safety precautionsSafety precautions navigation Personal safety before installing the deviceCable and connector safety Installation checklist Procedure stepsInstallation preparation Installation Unpacking the deviceInstalling an Nsna device into a rack Prerequisites for installing an Nsna into a rackInstalling an Nsna device into a rack Installation Installing an Nsna device into a rack Connecting network cables Connecting serial cablesCabling the device Cabling the device navigationSerial connection parameters Parameter Value Installation Creating a new cluster ConfigurationPrerequisites Specify the network connectivity port Enter a default gateway address Joining an Snas to an existing cluster Procedure steps Enabling the browser-based interface To enable the BBI, perform the following procedure Applying the Nortel Snas license EndpointsThrough BBI Enter the command /cfg/sys/host hostnumber/license Page Installation Quick Start Switch