Wire Feed Speed, CC Operation (See Figure B.2 or

See Table B.2)

When Across the Arc models are operated with CC power sources, the wire feed speed changes as the arc voltage changes. When the arc voltage increases, the wire feed speed will increase; and when the arc voltage decreases, the wire feed speed will decrease.

To preset the wire feed speed on CC power sources:

1.Set the Wire Feed Mode switch inside the LN-25™ PRO to "CC".

2.Refer to the Figure B.2 graph for the setting for the wire feed speed knob setting. Select the horizon- tal line representing the Desired Wire Feed Speed. (See Figure B.2 arrow for 375 in/min.)

3.Select the diagonal line representing the Arc Volts. (See Figure B.2 for 29 volts.)

4.Determine the vertical line representing the CC representing the CC Wire Feed Speed setting where the above two lines cross. (See Figure B.2 arrow line for 450.) Set the LN-25™ PRO wire feed speed knob to this value.

CCWFS dial setting = desired WFS x 35

 

Arc Volts

Example:

375 in/min. (Horizontal Line) x 35

 

 

 

29 Arc Volts (Diagonal Line)

 

 

= 13125 = 452-5 (Vertical Line)

 

29

 

Set the Wire Speed Control at 450”/min., and when welding at 29 volts the average actual speed should be approximately 375“/min.

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

 

FIGURE B.2

700

3533 V

650

 

 

31

600

29

 

550

27

500

25

 

450

23

 

 

21

400

19

 

350

17

300

15

 

250

200

150

100

50

 

 

 

 

 

 

 

 

 

 

600

650

700

50

100

150

200

250

300

350

400

450

500

550

CC

LN-25™ PRO

Image 19
Contents LN-25PRO Wire Feeder LN-25 PRO SafetyElectric Shock can kill ARC Rays can burn For Electrically Welding CuttingIii Sûreté Pour Soudage a L’Arc Précautions DE SûretéMaster Table of Contents for ALL Sections Table of Contents Installation Section Installation ELECTRIC SHOCK can Kill Safety PrecautionsHigh Frequency Protection LocationChanging the GUN Receiver Bushing Wire Drive ConfigurationCable Connections Shielding GAS ConnectionWire Guides Procedure to Install Drive RollsLoading Spools of Wire Pressure ARM AdjustmentGUN Connection Across the ARC SET-UPS Power Source to LN-25 PRO Cable Connection DiagramsDescription Figure A.7 Table of Contents Operation Section Operation Safety PrecautionsGeneral Description Description Wire Feed Speed KnobAnalog Voltmeter Figure B.2 Wire Feed Speed, CC Operation See Figure B.2 orTable B.2 VV CC Wire Speed Setting Figure B-3 Constant Current VS Constant Voltage Wire WeldingThermal LED, Motor Overload See Figure B.1 PIN GUN Trigger Connector See Figure B.1Wire Feed Speed Range Switch K2613-5 and K2613-7 only Work Sense LeadFigure B.4 Internal ControlsCold Feed Pushbutton Step Trigger Interlock SwitchCV/CC Switch Internal Controls DescriptionPreflow Timer Optional PREFLOW, Burnback Postflow Timer KIT K2330-2Figure B.5 Rear ControlsScfh POWER-UP SequenceGAS Purge Pushbutton Flow MeterLN-25 PRO Table of Contents Accessories Section Drive Roll Kits AccessoriesFactory Installed Equipment Wire TypeAccessories Accessories K435 Spindle Adapter, for mounting Installation of the K590-6 Water Cooling KIT Table of Contents Maintenance Section Calibration Specification MaintenanceRoutine Maintenance Periodic MaintenanceCover Wire Feed SpeedBoard Figure D.3. Major Component Location Control Board 1TABLE of CONTENTS-THEORY of Operation Section E-1Figure E.2 General Description Theory of OperationTRIGGER CIRCUIT Input PowerFigure E.4 Feedback & Control Circuits Feedback and Control CIR- CuitsFigure E.5 Optional Circuits & Digital Display Board Optional CircuitsLN-25 PRO Table of Contents Troubleshooting & Repair HOW to USE Troubleshooting Guide Troubleshooting & RepairPC Board Troubleshooting Procedures Fault Code Description Possible Adjustment Motor Solenoid Test Possible Areas Misadjustments Problems SymptomsRecommended Course of Action LN-25 PRO Test Description Case Removal ProcedureMaterials Needed Figure F.1 Case Removal ProcedureGAS Solenoid Test GAS Solenoid Control BOX Control BOX Cover Contactor Test Control BOX Contactor Drive Motor and Tach Feedback Test Case Control BOX Assembly Motor Overload Test Figure F.5 Control BOX Assembly Contactor Removal and Replacement Procedure Figure F.6 Control BOX Removal ProcedureFigure F.7 Buss BAR and Mounting Block Replacement ProcedureLN-25 PRO Front Panel Removal and Replacement Procedure Front Panel Troubleshooting & Repair Gas Hose Control BOX Wire Drive Panel Drive Gear Cover LN-25 PRO PC Board Removal and Replacement Procedure Figure F.11 Control PC Board Location PC BOARD Removal and Replacement ProcedureGAS Solenoid Removal and Replacement Procedure GAS Solenoid GAS Hose Control BOX Lock NUT Operation Verification SET UPRetest After Repair Retest a machineLN-25 PRO Table of Contents Diagram Section Wiring Diagram LN-25 PRO WiriNG DiaGram lN-25 prO CODEs 11507, 11508 G5681-1 Wiring DIAGRAM- LN-25 PRO Analog WiriNG DiaGram lN-25 prO CODEs 11746, 11747 G5681-3 G5683 LN-25 PRO Wire FeederLN-25 PRO Wire Feeder ElECTriCal DiaGrams G5683-1 Pushbutton LN-25 PRO Analog G5683-2G5683 G5683-3 Circuitryconfidential Equipmenttype Xres RXD Work 624 4783-1C0 Flexiblepowerfeede R 50V OF05 Circuitryconfidential S27505-1B0 R2 CW