vii | vii | |
| TAbLE OF CONTENTS (cont’d) |
|
| Drive Roll Installation | |
| Changing Drive Rolls for | |
| Changing Drive Rolls for | |
| Wire Loading | |
| Loading a 22 to 30 lb. | |
| Loading a 10 to 30 lb. Spool | |
| Loading 50 and 60 lb. Coils | |
| Loading and Feeding | |
| Idle Roll Pressure Setting | |
| ||
| ||
| Making a Test Weld and Adjusting Response and Starting | |
| Adjust the Power Source | |
| Adjust the LN9 GMA Controls | |
| Voltage Control Response | |
| Starting Characteristics | |
| Making a Weld | |
| Procedure at End of Coil | |
| Security of Weld Procedure Settings |
Accessories | Section C |
Auxiliary Equipment Contacts | |
Optional Equipment and Accessories | |
Power Input Cable Assemblies (K196, K595, K596) | |
Wire Reel Stands and Mountings | |
Gun and Cable Assemblies | |
Wire Feeder Accessories |
Maintenance | Section D |
Routine Maintenance | |
Drive Rolls and Guide Tubes | |
Wire Reel Mounting – 50 and 60 lb. Coils | |
Wire Reel Mounting | |
Periodic Maintenance | |
Control Box | |
Wire Drive Motor and Gear Box |