Lincoln Electric IM579 manual Operating Overlays, Overview, Installing AN Overlay

Page 16

B-5

B-5

OPERATION

OPERATING OVERLAYS

OVERVIEW

The Power Wave is controlled by a panel of keys (key- pad) located on the front of the machine. The opera- tor can access controls by placing an overlay over the keys.

An OVERLAY is a special plastic sheet with a number of keys and symbols printed on one side and a bar code printed on the other. See Figure B.2. The print- ed keys allow the operator to communicate with the machine for a specific set of functions. The bar code allows the machine to identify the overlay.

FIGURE B.2 – TYPICAL POWER WAVE OVERLAY

C COPYRIGHT 1994 THE LINCOLN ELECTRIC COMPANY CLEVELAND, OHIO USA

L9361-2 WELD FROM MEMORY

RINVERTEC POWER WAVE

WARNING

HIGH TEMP.

 

 

 

MEMORY RECALL

 

 

 

 

 

 

PROGRAM LIST

 

M

1

M

2

 

 

 

 

 

 

 

 

 

1

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M

3

M

4

 

3

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M

5

M

6

 

 

 

 

 

 

 

 

 

5

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M

7

M

8

 

 

 

 

 

 

 

DISPLAY

 

7

 

8

 

 

RECALL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INSTALLING AN OVERLAY

1.Open the ACCESS DOOR by grasping the provid- ed indent on the door and pulling the door for- ward. See Figure B.3 for door location.

FIGURE B.3 – OVERLAY ACCESS DOOR

5

3

1

2

4

Before the Power Wave is turned ON, the operator selects the desired overlay and mounts it in the over- lay frame on the front of the machine. Then, when the machine is turned ON, it reads the overlay bar code and configures the machine accordingly, allowing the operator to access only certain keys. The machine must be powered up each time an overlay is changed.

1OVERLAY ACCESS DOOR

2OVERLAY FRAME

3ACCESS DOOR INDENT

4TRACKS

5LOCATING PINS

2.Select the desired overlay from the storage com- partment located behind the access door.

3.Remove any overlay already in the overlay frame and place it in the storage compartment.

4.Slide the new overlay into the overlay frame. Align the overlay with the two tracks on the sides of the frame. Be sure the overlay is seated in the bottom lip of the frame and on the top two locating pins. Close the access door securely.

POWER WAVE 450

Image 16
Contents Invertec Power Wavetm Safety Depends on YouSafety Electric Shock can killARC Rays can burn Fumes and Gases can be dangerousCylinder may explode if damaged Welding Sparks can cause fire or explosionFor Electrically pow- ered equipment Electric and Magnetic Fields For Engine powered equipmentMay be dangerous Précautions DE Sûreté Thank You Please Examine Carton and Equipment For Damage ImmediatelyTable of Contents Technical Specifications Power Wave InstallationPulse Pulse and Background Current Range Voltage Range Safety Precautions High Frequency PrecautionsInput Connections Select Suitable LocationInput Voltage Reconnect Procedure Input Power ConnectionsInput Fuse and Supply Wire Considerations Ground ConnectionsWire Feeder Connections Output ConnectionsWork and Electrode Cable Connections Water Cooler ConnectionsSafety Instructions OperationOperating Instructions Fumes and Gases can beSelect your process information Save process information if desiredDesign Features and Advantages Operational Features and ControlsSynergic Welding Recommended ProcessesControls and Settings Case Front ControlsOperating Overlays Installing AN OverlayOverview Overlay Overlay TypesName PULSE, GMAW, FCAW, and STICK/TIG Process Selection Overlay Overlay ID Number =Operation Then Weld from Memory Overlay Memory Location # is EmptyWeld from MEMORY, Dual Procedure Overlay Figure B.6 Weld from MEMORY, Dual Procedure OverlayOperation Dual Wire FEEDERS, Dual Procedure Overlay Optional Position ProcedureLimits Overlay Optional Recall from Memory KEY Memory Location NumbersOperation Setup Overlay Figure B.9 Setup OverlayWire Feeder Setup Description Positive Polarity Voltage SensingTable B.1 Positive Voltage Sensing Options Negative Polarity Voltage SensingPositive Voltage Sensing Polarity Overview of Welding Procedures Flux Cored ARC Welding Fcaw and Gmaw ProceduresPulse Procedures STICK/TIG ProceduresExplanation of Table B.3 Pulse Welding Pulse processesThermal Protection Overload ProtectionOver Current Protection Accessories OPTIONS/ACCESSORIESWire Feeder Setup Guns and CablesWater Cooler Usage Routine and Periodic Maintenance MaintenanceInput Filter Capacitor DIS Charge Procedure Figure D.1 Resistor Locations Discharge labels, on each of the four Switch Locate the #9 and #12 terminals, identified byPreventive Maintenance Figure D.4 General Component Locations Troubleshooting HOW to USE Troubleshooting GuideAuthorized Field Service Facility Troubleshooting GuideSists, contact your local Lincoln Play fans run Check circuit breaker 5-amp Observe Safety Guidelines Controls and Settings Power-up Inspect the overlay bar code Saved in memory are different Check for proper shielding gas Wiring Diagrams Wiring DiagramNew Lessons in Arc Welding How To Read Shop DrawingsNeed Welding Training? Precaucion Aviso DE Limited Warranty