Blue Sea Systems P12 Screen Summary, Charger Summary, Configuration Menu, Display Setup

Page 20

Screen Summary

Charger Summary

The Charger Summary screen provides data of the battery’s status while the battery charger is operational.

Options:

-Press the History button to view previous charger performance

-Press the Menu button to view the Configuration Menu

How to Get Here:

From other screens in the charger, select the Back button.

P12

7521 AND 7522 BATTERY CHARGERS

Configuration Menu

The Configuration Menu has six user selections that allow modifications to Fan Speed, Charger Output, Display, Battery Parameters, Temperature Limits, and Diagnostics.

Options:

-Scroll through the menu and select the desired option.

How to Get Here:

From the Charger Summary Screen, select the Menu button. From other screens, select the Back button.

Display Setup

The Display Setup allows the user to customize the display settings.

Options:

-Adjust Contrast

-Adjust Backlighting

-Set a Backlight Timer (length of time backlight will remain on)

-Select a language

How to Get Here:

From the Configuration Menu, select the Display button.

Charger Setup

The Charger Setup Menu is where the Battery Type and Absorb Timers are selected. Caution read Absorption Parameters and Timers on page 14 before adjusting absorb timers.

Options:

-Select Battery Type or set Absorb Timers.

-If “User” is the selected battery type you may also adjust Absorb and Float voltage. See page 14 for more information

How to Get Here:

From the Configuration Menu, select the Battery button.

18Specifications are subject to change. See bluesea.com/P12 for current information.

Image 20
Contents P12 Page Table of Contents P12 P12 Battery Charger Overview Charging Specifications Product Dimensions Installation ClearancesAccessory Pack Included ComponentsRing terminals Supplies NeededSocket wrench AC Strain Relief Installation InstructionsInstallation Steps Wiring Connections Optional Installations see pagesInitial Charger Setup Advanced Charger Setup Reset to Manufacturer Defaults Absorption Parameters and Timers Temperature Parameters Minimum Charge Temperature The default is 0ºCMaximum Charge Temperature The default is 50ºC Battery Temperature Compensation TempcoEqualization Definition of EqualizationPrior to Equalization Equalization ProcessP12 Configuration Menu Display SetupCharger Setup Screen SummaryTemperature Parameters System Status Absorb TimersSystem Status System Status Hour MeterAlert Screens and Diagnostics AC Input Voltage Too Low AC Input Voltage Too HighDC Output Voltage Too High DC FuseOptional Installation Optional Connection FuseSI ES ES SI Engine ACR Optional Accessory SpecificationsCable Connection Four Control ButtonsDimensioned Drawing Display Indicators Fan ModeCharging Charge StageAlerts and Diagnostics ButtonsWarranty and Contact Information Date of first purchase meansBlue Sea Systems Technical Support Related ProductsTwin Engine P12 Charge Management System980012000 Rev