Optional Installation (continued)

P12

7521 AND 7522 BATTERY CHARGERS

ML-ACR Installation Instructions (PN 7620 and PN 7622) to Enable Start Isolation*

1.Disconnect the black ground wire connected to the ML-ACR wire harness.

2.If present, disconnect all Start Isolation wires connected to the Brown, Green, and Orange wires in ML-ACR wire harness.

3.Connect a wire from the ACR 1 port marked “SI” (Start Isolation) on the P12 Battery Charger to both the Brown and Green wires in the ML-ACR wire harness.

NOTE: Connecting the “SI” (Start Isolation) wire to only one of the ML-ACR isolation wires will not properly integrate the P12 battery charger with your ML-ACR.

4.Connect a wire from the ACR 1 terminal marked “ES” (Engine Start Switch) to the terminal or wire running from the start key switch to the starter solenoid.

NOTE: This connection can be made at the start key switch or at the starter solenoid, but must be to the line that is +12V DC positive only when cranking. Connection to a line that is positive while the engine is normally running will prevent the charging relay from working properly.

5.Re-connect the black DC Negative (Ground) wire in the ML-ACR wire harness

6.If connecting two ML-ACRs repeat steps 1 through 5 using the second ML-ACR, engine, and the P12 Battery Charger ports associated with ACR 2

*The ML-ACRs also support “Engine Isolation” which keeps an ACR open if two engines are running simultaneously. Operating in this mode while using Charger Coordination requires a special installation. See bluesea.com/P12 for details.

SI ES

ES SI

 

 

ACR 1

ACR 2

 

 

SI: Start Isolation (ACR)

Temperature

Remote

ES: Engine Start Switch

Sensor

Display

OPTIONAL CONNECTION

 

ENGINE

 

 

START

 

 

SWITCH

ON

 

 

START

 

 

OFF

ML-Series

START

Automatic

 

 

Charging

 

 

Relay

 

 

A

B

HOUSE

 

 

 

START ISOLATION #1 (BROWN)

START ISOLATION #2 (GREEN)

ENGINE ISOLATION #3 (ORANGE)

GROUND (BLACK)

OPTIONAL CONNECTION

SI ES

ES SI

 

 

ENGINE

 

ACR 1

ACR 2

 

 

 

SI: Start Isolation (ACR)

Temperature

Remote

START

 

SWITCH

ON

ES: Engine Start Switch

Sensor

Display

 

START

 

 

 

 

 

OFF

ML-Series

 

 

 

 

Automatic

 

 

 

 

Charging

 

 

START

 

Relay

 

 

 

 

 

 

 

 

 

 

7520

 

 

 

 

 

BATTERY CHARGER LED REMOTE

 

 

A

B

 

ISOLATION #1 (BROWN)

 

 

ISOLATION #2 (GREEN)

ISOLATION #3 (ORANGE)

GROUND (BLACK)

DC GROUND

Specifications are subject to change. See bluesea.com/P12 for current information.

23

Image 25
Contents P12 Page Table of Contents P12 P12 Battery Charger Overview Charging Specifications Installation Clearances Product DimensionsIncluded Components Accessory PackSocket wrench Supplies NeededRing terminals Installation Steps Installation InstructionsAC Strain Relief Optional Installations see pages Wiring ConnectionsInitial Charger Setup Advanced Charger Setup Reset to Manufacturer Defaults Absorption Parameters and Timers Minimum Charge Temperature The default is 0ºC Temperature ParametersMaximum Charge Temperature The default is 50ºC Battery Temperature Compensation TempcoDefinition of Equalization EqualizationPrior to Equalization Equalization ProcessP12 Display Setup Configuration MenuCharger Setup Screen SummarySystem Status Absorb Timers Temperature ParametersSystem Status System Status Hour MeterAlert Screens and Diagnostics AC Input Voltage Too High AC Input Voltage Too LowDC Output Voltage Too High DC FuseOptional Connection Fuse Optional InstallationSI ES ES SI Engine ACR Specifications Optional AccessoryCable Connection Four Control ButtonsDimensioned Drawing Fan Mode Display IndicatorsCharging Charge StageButtons Alerts and DiagnosticsDate of first purchase means Warranty and Contact InformationBlue Sea Systems Technical Support Related ProductsP12 Charge Management System Twin Engine980012000 Rev