Blue Sea Systems P12 user manual Included Components, Accessory Pack

Page 9

Included Components

P12

7521 AND 7522 BATTERY CHARGERS

1.Four Mounting Screws

2.Two AC Strain Relief and Insulating Cover Screws

3.One AC Strain Relief and Insulating Cover

4.Three AC Termination Screws: AC Line: Gold, AC Neutral: Silver, AC Ground: Green

5.Three DC Strain Relief C-Clamp Screws

6.One DC Strain Relief C-Clamp

7.Four DC Termination Nuts

8.One DC Safety Ground Nut

9.One Battery Temperature Sensor

10.One Packet of Dielectric Grease

11.Accessory Pack Includes:

Accessory Pack

AC Line

AC Neutral

AC Ground

 

 

 

 

 

 

 

 

Gold

Silver

Green

 

 

#12 x 1-1/4"

M3 x 25mm

M4 x 10mm

M3 x 30mm

M6 serrated

Screw terminal

sheet metal screw

pan-head

 

pan-head

pan-head

flange hex-nut

plug for ACR

 

machine screw

machine screws

machine screw

 

connection

2 M3 x 25mm pan-head machine screws (Use #1 Phillips screwdriver) Recommended torque: 5–10 in-lb (0.6–1.1 Nm)

5

M3 x 30mm pan-head machine screws (Use #1 Phillips screwdriver) Recommended torque:

5–10 in-lb (0.6–1.1 Nm)

6

3

M4 x 10mm pan-head

machine screws,

 

(Use #2 Phillips

 

screwdriver)

 

Recommended torque:

 

10–15 in-lb

 

(1.0–1.8 Nm)

4

8

7

M6 serrated flange hex-nuts (Use 10mm socket wrench with extension) Recommended torque: 70–80 in-lb (8–9 Nm)

M6 serrated flange hex-nut (see #7 above)

9 RJ11 connector with peel and stick adhesive, 15 ft (4.6m) long tether

10 Used for Temperature Sensor and the Optional Accessory P12 Remote Display Connections (see pages 24–27). View the MSDS for the Dielectric Grease at bluesea.com/P12

Dielectric Grease

1

#12 x 1-1/4" sheet metal screws (Use #3 Phillips screwdriver)

Specifications are subject to change. See bluesea.com/P12 for current information.

7

Image 9
Contents P12 Page Table of Contents P12 P12 Battery Charger Overview Charging Specifications Installation Clearances Product DimensionsIncluded Components Accessory PackSupplies Needed Socket wrenchRing terminals Installation Instructions Installation StepsAC Strain Relief Optional Installations see pages Wiring ConnectionsInitial Charger Setup Advanced Charger Setup Reset to Manufacturer Defaults Absorption Parameters and Timers Minimum Charge Temperature The default is 0ºC Temperature ParametersMaximum Charge Temperature The default is 50ºC Battery Temperature Compensation TempcoDefinition of Equalization EqualizationPrior to Equalization Equalization ProcessP12 Display Setup Configuration MenuCharger Setup Screen SummarySystem Status Absorb Timers Temperature ParametersSystem Status System Status Hour MeterAlert Screens and Diagnostics AC Input Voltage Too High AC Input Voltage Too LowDC Output Voltage Too High DC FuseOptional Connection Fuse Optional InstallationSI ES ES SI Engine ACR Specifications Optional AccessoryCable Connection Four Control ButtonsDimensioned Drawing Fan Mode Display IndicatorsCharging Charge StageButtons Alerts and DiagnosticsDate of first purchase means Warranty and Contact InformationBlue Sea Systems Technical Support Related ProductsP12 Charge Management System Twin Engine980012000 Rev