Xantrex Technology 815-3524, 815-2524-02 manual Orientation Approved Mounting Orientation? Comment

Page 36

Installing the Inverter/Charger

Orientation

Approved Mounting

Orientation? Comment

Wall Mount DC on Left

0003 SWMODEERF

0003

SWMODEERF

AB

A - Yes

B - Yes when used with inverter drip shield (PN: 808-9004) for marine installations.

A - On a vertical surface with DC terminals facing left.

B - On a vertical surface with DC terminals facing left with the front panel facing up. The drip shield is installed on top of the inverter with some clearance. See “Drip Shield Placement (Inverter Front Panel Facing Up)” on page 64.

Wall Mount DC on Right

FREEDOM SW

3000

A

FREEDOM SW

3000

B

A - Yes

A - On a vertical surface with DC terminals

 

facing left.

B - Yes when used with an

B - On a vertical surface with DC terminals

inverter drip shield

facing right with the front panel facing down.

(PN: 808-9004) for

The drip shield is installed directly on top of the

marine installations.

inverter. See “Drip Shield Placement (Inverter

 

Front Panel Facing Down)” on page 65.

22

Freedom SW 230V Installation Guide

Image 36
Contents Freedom SW Sine Wave Inverter/Chargers Page This guide for use by qualified About This Guide PurposeImportant Safety Instructions Electrical Shock and Fire HazardElectrical Shock Hazard Fire and Burn Hazard Explosion HazardPrecautions When Working With Batteries Exposure to Chemicals and Gases Hazard Risk of Damage to the INVERTER/CHARGERRegulatory Limitations on USEPage Contents Page This guide for use by qualified installers only Page Introduction Materials List Freedom SW 230V Installation Guide Materials ListInstallation Information Before You Begin the InstallationInstallation Codes Electrical Shock and Fire HazardsAbout the Xanbus System Xanbus SystemXanbus-enabled Products and Accessories About the Xanbus SystemPlanning the Installation Two Key Performance FactorsSize and Length of DC Cables Mounting Location of the Freedom SWPlanning Preparations AC, DC, and Network ComponentsPlanning Preparations Planning Preparations AC Components AC InputAC Disconnect and Over-Current Protection Device AC OutputAC Wiring Distribution PanelsModels Freedom SWDC Components BatteriesDC Cabling Fire HazardDC Disconnects and Over-Current Devices DC GroundingMarine Applications1 Heavy Item To unpack and inspectInstallation Tools and Materials ToolsMaterials Installing the Inverter/Charger OverviewChoosing a Location for the Inverter/Charger Fire and Explosion HazardHeat Hazard Safe Mounting the Inverter/Charger ConsiderationsTo mount the inverter/charger Approved Mounting Orientation Orientation? Comment Orientation Approved Mounting Orientation? Comment This guide for use by qualified Connecting the AC Input and AC Output Wires General AC Wiring ConsiderationsFIRE, Electrical SHOCK, and Energy Hazards Connecting AC Input Wires Correct Batter Polarity will Cause Damage toInstalling the Inverter/Charger Connecting the AC Output Wires To make the AC output wiring connectionsEquipment Damage Connecting the DC Cables DC Connection PrecautionsRecommended Cable Sizes and Lengths and Fuse Size Preparing the CablesGuidelines for Routing the DC Cables Connecting the DC Cables to the Inverter/Charger Equipment Damage DUE to Reverse PolarityTo connect the DC cables DC Cable Connections To connect the chassis ground Connecting the Battery Temperature Sensor BTS Mounting OptionsMounting to the Negative Battery Terminal To mount the sensor on the negative battery terminalBTS port Mounting to the Side of the Battery Case To mount the sensor on the battery caseConnecting to the Network To connect the Freedom SW 230V to the Xanbus networkPerforming Checks Prior to Initial Start-Up Testing Your Installation Testing in Invert ModeTesting in Charge Mode and AC Bypass Mode Installation CompleteTo verify that the Freedom SW 230V starts charging Stacking Features Parallel Stacking DC Connections for Stacked Inverters Connect the stacked system as followsNeutral Wiring for Stacked Inverters Configuring System for Stacked Operation To configure the system for stackingSearch Mode Operation in Parallel Stacking Wiring SchematicDisabling Search Mode on the Master Unit Setting Search Mode on the Slave UnitCharger Settings in a Dual Freedom SW Configuration CalculationsTo set the Max Chg Rate % setting in each Freedom SW ExamplesTo set the Max Chg Rate % setting in each Freedom SW To set the Max Chg Rate % setting in each Freedom SW Inverter/Charger Physical Specifications Freedom SW Physical SpecificationsBattery Information Battery Bank SizingEstimating Battery Requirements Calculating Battery SizeBattery AMP-HOURS Used = AC WATT-HOURS÷10 Watts = Volts × AmpsDaily watt-hours needed Battery Banks Battery Bank Sizing WorksheetRestrictions on Motor Size Battery Information Battery Sizing Worksheet Battery Cabling and Hook-up Configurations Battery Series ConnectionBattery Series-Parallel Connections Specifications Environmental SpecificationsInverter Specifications Charger Specifications Transfer and General Specifications Inverter Drip Shield Installation To install the drip shieldShock Hazard Drip Shield Placement Desktop Mount 20 mm No clearance required here Page Page Schneider Electric Solar Inverters USA Inc