Xantrex Technology 815-2524-02, 815-3524 manual BTS port

Page 49

8.Turn the battery switch on again (if you opened it in Step 2.)

9.Route the sensor cable to the inverter/charger and plug it into the blue BTS port, as shown in Figure 12. Secure the cable along its length.

SW

BTS port

FREEDOM 3012

Reset

I

 

nver

 

Enable

 

ter

I

 

 

nver

C/

 

Enabled C

 

ter

 

 

A

 

 

har

 

 

ge

Fault

FREEDOM

SW

 

 

 

 

3012

Figure 12 Connecting the BTS Cable to BTS Port

975-0697-01-01

Installing the Inverter/Charger

This guide for use by qualified personnel only.

35

Image 49
Contents Freedom SW Sine Wave Inverter/Chargers Page This guide for use by qualified Purpose About This GuideElectrical Shock and Fire Hazard Important Safety InstructionsElectrical Shock Hazard Explosion Hazard Fire and Burn HazardPrecautions When Working With Batteries Risk of Damage to the INVERTER/CHARGER Exposure to Chemicals and Gases HazardLimitations on USE RegulatoryPage Contents Page This guide for use by qualified installers only Page Introduction Materials List Materials List Freedom SW 230V Installation GuideBefore You Begin the Installation Installation InformationInstallation Codes Electrical Shock and Fire HazardsXanbus System About the Xanbus SystemAbout the Xanbus System Xanbus-enabled Products and AccessoriesTwo Key Performance Factors Planning the InstallationSize and Length of DC Cables Mounting Location of the Freedom SWAC, DC, and Network Components Planning PreparationsPlanning Preparations Planning Preparations AC Input AC ComponentsAC Disconnect and Over-Current Protection Device AC OutputDistribution Panels AC WiringFreedom SW ModelsBatteries DC ComponentsDC Cabling Fire HazardDC Grounding DC Disconnects and Over-Current DevicesMarine Applications1 To unpack and inspect Heavy ItemTools Installation Tools and MaterialsMaterials Overview Installing the Inverter/ChargerFire and Explosion Hazard Choosing a Location for the Inverter/ChargerHeat Hazard Safe Considerations Mounting the Inverter/ChargerTo mount the inverter/charger Approved Mounting Orientation Orientation? Comment Orientation Approved Mounting Orientation? Comment This guide for use by qualified General AC Wiring Considerations Connecting the AC Input and AC Output WiresFIRE, Electrical SHOCK, and Energy Hazards Correct Batter Polarity will Cause Damage to Connecting AC Input WiresInstalling the Inverter/Charger To make the AC output wiring connections Connecting the AC Output WiresEquipment Damage DC Connection Precautions Connecting the DC CablesRecommended Cable Sizes and Lengths and Fuse Size Preparing the CablesGuidelines for Routing the DC Cables Equipment Damage DUE to Reverse Polarity Connecting the DC Cables to the Inverter/ChargerTo connect the DC cables DC Cable Connections To connect the chassis ground Mounting Options Connecting the Battery Temperature Sensor BTSTo mount the sensor on the negative battery terminal Mounting to the Negative Battery TerminalBTS port To mount the sensor on the battery case Mounting to the Side of the Battery CaseTo connect the Freedom SW 230V to the Xanbus network Connecting to the NetworkPerforming Checks Prior to Initial Start-Up Testing in Invert Mode Testing Your InstallationInstallation Complete Testing in Charge Mode and AC Bypass ModeTo verify that the Freedom SW 230V starts charging Stacking Features Parallel Stacking Connect the stacked system as follows DC Connections for Stacked InvertersNeutral Wiring for Stacked Inverters To configure the system for stacking Configuring System for Stacked OperationWiring Schematic Search Mode Operation in Parallel StackingDisabling Search Mode on the Master Unit Setting Search Mode on the Slave UnitCalculations Charger Settings in a Dual Freedom SW ConfigurationExamples To set the Max Chg Rate % setting in each Freedom SWTo set the Max Chg Rate % setting in each Freedom SW To set the Max Chg Rate % setting in each Freedom SW Freedom SW Physical Specifications Inverter/Charger Physical SpecificationsBattery Bank Sizing Battery InformationCalculating Battery Size Estimating Battery RequirementsBattery AMP-HOURS Used = AC WATT-HOURS÷10 Watts = Volts × AmpsDaily watt-hours needed Battery Bank Sizing Worksheet Battery BanksRestrictions on Motor Size Battery Information Battery Sizing Worksheet Battery Series Connection Battery Cabling and Hook-up ConfigurationsBattery Series-Parallel Connections Environmental Specifications SpecificationsInverter Specifications Charger Specifications Transfer and General Specifications To install the drip shield Inverter Drip Shield InstallationShock Hazard Drip Shield Placement Desktop Mount 20 mm No clearance required here Page Page Schneider Electric Solar Inverters USA Inc