| 1 | Power Company Service | |
|
|
|
| Meter |
|
|
|
| 2 Main and Branch Overcurrent | ||
|
|
|
| Protection |
|
|
|
| 3 | ||
|
|
|
| Transfer Switch | |
. |
| Obtain and install correct switch. | |||
| Switch rating must be same as or | ||||
generator is to supply standby power during |
| greater than the branch overcurrent | |||
emergencies or power outages. |
| protection. |
| ||
1 |
|
| 4 Circuit Breakers or Fused | ||
240 V |
|
| Disconnect Switch | ||
|
|
| |||
|
| Obtain and install correct switch. | |||
|
|
| |||
120/240 Volt |
|
| 5 | Extension Cord | |
120 V |
| Select as shown in Section | |||
60 Hz |
| ||||
120 V |
| 6 | Generator Connections | ||
Service |
| ||||
|
| Connect terminals or plug of ade- | |||
|
|
| |||
| Neutral |
| quate amperage capacity to cord. | ||
2 |
| Follow all applicable codes and | |||
|
| ||||
| 3 | safety practices. | |||
| 240 V |
| Turn off or unplug all equipment | ||
|
| connected to | generator before | ||
|
|
| starting or stopping engine. When | ||
|
|
| starting or stopping, the engine has | ||
| 120 V |
| low speed which causes low volt- | ||
Load | 120 V |
| age and frequency. | ||
|
| 7 | Load Connections | ||
|
|
| |||
|
| 4 |
|
|
|
7 |
|
|
|
|
|
| CB |
|
|
|
|
| or |
| Item 4 is not necessary if circuit | ||
|
|
| |||
| F1 |
| protection is already present in | ||
|
|
| welding | generator | auxiliary |
|
|
| power output circuit. |
| |
6 |
| 5 |
|
|
|
| 240 V |
|
|
|
|
120/240 Volt | 120 V |
|
|
|
|
|
|
|
|
|
|
120 V |
|
|
|
| |
Generator Output |
|
|
|
|
|
Connection | Ground |
|
|
|
|