Hobart Welding Products 3225D manual Power Company Service, Obtain and install correct switch, 120

Page 45

10-10. Typical Connections To Supply Standby Power

 

 

 

 

 

 

 

1

Power Company Service

 

 

 

 

Meter

 

 

 

 

2 Main and Branch Overcurrent

 

 

 

 

Protection

 

 

 

 

3 Double-Pole, Double-Throw

 

 

 

 

Transfer Switch

. Customer-supplied equipment is required if

 

Obtain and install correct switch.

 

Switch rating must be same as or

generator is to supply standby power during

 

greater than the branch overcurrent

emergencies or power outages.

 

protection.

 

1

 

 

4 Circuit Breakers or Fused

240 V

 

 

Disconnect Switch

 

 

 

 

 

Obtain and install correct switch.

 

 

 

120/240 Volt

 

 

5

Extension Cord

120 V

 

Select as shown in Section 10-11.

60 Hz

 

Three-Wire

120 V

 

6

Generator Connections

Service

 

 

 

Connect terminals or plug of ade-

 

 

 

 

Neutral

 

quate amperage capacity to cord.

2

 

Follow all applicable codes and

 

 

 

3

safety practices.

 

240 V

 

Turn off or unplug all equipment

 

 

connected to

generator before

 

 

 

starting or stopping engine. When

 

 

 

starting or stopping, the engine has

 

120 V

 

low speed which causes low volt-

Load

120 V

 

age and frequency.

 

 

7

Load Connections

 

 

 

 

 

4

 

 

 

7

 

 

 

 

 

 

CB

 

 

 

 

 

or

 

Item 4 is not necessary if circuit

 

 

 

 

F1

 

protection is already present in

 

 

 

welding

generator

auxiliary

 

 

 

power output circuit.

 

6

 

5

 

 

 

 

240 V

 

 

 

 

120/240 Volt

120 V

 

 

 

 

Single-Phase

 

 

 

 

 

Three-Wire

120 V

 

 

 

 

Generator Output

 

 

 

 

 

Connection

Ground

 

 

 

 

S-0405-A

OM-480 Page 41

Image 45
Contents Description ProcessesFrom Hobart to You Table of Contents Page Arc Welding Hazards Symbol UsageElectric Shock can kill ARC Rays can burn eyes and skinEngine Hazards Moving Parts can cause injury Battery Explosion can BlindEngine Exhaust Gases can kill Engine Heat can cause fireEMF Information Principal Safety StandardsRadiation can cause interference ARC Welding can cause interferenceConsignes DE SÉ Curité Lire Avant Utilisation Signification des symbolesUN Choc É Lectrique peut tuer LES Fumé ES ET LES GAZ peuvent ê tre dangereuxDES Particules Volantes peuvent blesser les yeux LE Soudage peut provoquer un in- cendie ou une explosionDES PIÈ CES Chaudes peuvent provoquer des brû lures graves LE Bruit peut affecter l’ouïe’EXPLOSION DE LA Batterie peut DES Organes Mobiles peuvent provoquer des blessuresLA Chaleur DU Moteur peut pro- voquer un incendie LA Chute DE L’APPAREIL peut blesserInformation sur les champs é lectromagné tiques Principales normes de sé curitéLE Soudage À L’ARC risque de provoquer des interfé rences Consignes relatives aux stimulateurs cardiaquesDefinitions Symbols And DefinitionsSpecifications Weld, Power, And Engine SpecificationsDimensions, Weights, And Operating Angles Exceeding duty cycle can damage unit and void warranty Curve shows typical fuel use under weld or power loadsFuel Consumption Duty Cycle And OverheatingVolt-Ampere Curves AC Auxiliary PowerOptional AC Power Plant Curves Installation Installing Welding GeneratorConnecting The Battery Engine Prestart Checks Installing Muffler PipeStop engine and let cool FuelInstalling Ether Cylinder Optional Ether Starting Aid Connecting To Weld Output TerminalsPut cap on fitting when cylinder is removed Selecting Weld Cable Sizes 100 ft 30 m Or Less10 100% Duty Cycle Controls See Section Operating the Welding GeneratorRemote A/V Control Description Of Front Panel Controls See SectionOperating Auxiliary Equipment Volt Duplex And Optional Gfci ReceptaclesX 15 a + 120 V x 10 a = 3.0 kVA/kW 240 V 15 a AC Receptacle RC1 Volt Duplex Receptacle OptionalCircuit Breakers CB1 And CB2 X 10 a + 120 V x 5 a = 3.0 kVA/kWConnecting Optional Auxiliary Power Plant 240 Volt Twistlock Receptacle Optional Maintenance and Troubleshooting Maintenance Label To Clean air filter Servicing Air CleanerStop engine HoseServicing Fuel And Lubrication Systems To change oil and filterTo replace primary fuel filter Adjusting Engine Speed Standard ModelsModels With Automatic Idle Optional Full Empty Overload Protection Servicing Optional Ether Starting AidInspecting And Cleaning Optional Spark Arrestor TroubleshootingWelding Check connections to auxiliary power plant see Section Auxiliary PowerEngine Maximum see SectionCircuit Diagram For Welding Generator Electrical DiagramWetstacking RUN-IN ProcedureStop engine Do not touch hot exhaust Run-In Procedure Using Load BankBank/grid From flammablesRun-In Procedure Using Resistance Grid Auxiliary Power Guidelines Selecting EquipmentGrounding Generator To Truck Or Trailer Frame How Much Power Does Equipment Require? Grounding When Supplying Building SystemsEarth ground if supplying Amperes x Volts = WattsApproximate Power Requirements For Farm/Home Equipment Approximate Power Requirements For Industrial MotorsIndustrial Motors Rating Starting Watts Running Watts Farm/Home Equipment Rating Starting Watts Running WattsContractor Rating Starting Watts Running Watts Approximate Power Requirements For Contractor EquipmentHow Much Power Can Generator Supply? Power Required To Start MotorSingle-Phase Induction Motor Starting Requirements KVA/HP x HP xObtain and install correct switch Power Company ServiceSafety practices 120 Single-PhaseCurrent Load Watts Amperes Selecting Extension Cord Use Shortest Cord PossibleOM-480 125 124 123 122 71Includes 119 121 120 117 Parts List116 114 106 112 113 111Fig 109 108 110 107 105 102 100 103 104126 65Fig Dia Part Description Mkgs Quantity 128 111 Panel, Front w/Components -1 ItemPanel, Front w/Components -1 Item 111 Cont’d Generator Generator -1 Item Includes 114Page Page Support ServiceContact your Distributor for Hobart Welding ProductsCall