Tighten V-Belts
The final step in the set up process must be done after approximately 16 hours of operation. During this first 16 hours, the
Note: Pulleys and belts run very hot. This is a normal condition. Allow them to cool before mak- ing adjustments.
Note: A collection of black belt dust at the bottom of the belt housing is a normal during the life of the machine.
Recommended
Adjustments
For your convenience, the adjustments listed below have been performed at the factory and no further setup is required to operate your machine.
However, because of the many variables involved with shipping, some of these adjustments may need to be repeated to ensure optimum cutting results. Keep this in mind as you start to use your new planer.
1.Table Parallelism (Page 28).
2.Chain Drive Tension (Page 28).
3.Infeed/Outfeed Roller Height (Page 30).
4.Spring Tension (Page 33).
5.Chip Breaker Height (Page 30).
6.Pressure Bar Height (Page 30).
7.Chip Deflector Positioning (Page 33).
Model G1033X (Mfg. since 4/10)