.A complete Parts List is available at www.MillerWelds.com
6-8. Torch And Work Cable Connections
6 | 4 | 8 | 5 |
7
2
1
3
5 6
2
4
3
Tools Needed:
Torx 25 1/4 in
YCheck DC bus voltage according to Section
If torch or work cable needs to be removed or replaced, proceed as follows:
Turn power Off, and disconnect input power plug from receptacle. Remove wrapper from unit (see Section
Torch Connections
Remove existing torch cable from unit.
1 Strain Relief
Loosen strain relief screw.
2 Torch Cable
Insert cable through strain relief, but do not tighten.
3 Air Line Connector
Insert air line connector into solenoid fitting. Pull slightly on torch to set fitting.
4 Plug PLG1/Receptacle RC1
Connect PLG1 from torch to receptacle RC1 on end of wiring harness connected to circuit board PC1.
5Ring Terminal And TORCH WHITE Terminal
Connect ring terminal on end of white leads to TORCH WHITE terminal.
6Ring Terminal And TORCH RED Terminal
Connect ring terminal on end of red leads to TORCH RED terminal.
Tighten strain relief screw.
Work Cable Connections
Remove existing work cable from unit.
7 Strain Relief
Loosen strain relief screw.
.Be sure to allow some work cable slack inside the unit.
Insert work clamp lead through strain relief, but do not tighten.
8Work Lead Ring Terminal And WORK BLACK Terminal
Connect ring terminal on end of work clamp lead to terminal labeled WORK BLACK terminal. Route lead along torch lead bundle.
Tighten strain relief screw.
Reinstall wrapper.
Ref. 804