Cisco Systems STEV SRT-M-66, 2654T6 appendix Review Draft Cisco Confidential

Page 18

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT — CISCO CONFIDENTIAL

Step 8 Shift the pallet to ensure that it is positioned evenly all the way around the scissor-jack platform and the bolt holes in the hold-down brackets on the sides of the scissor-jack platform are aligned with the holes in the top of the shipping pallet.

Step 9 Turn the scissor-jack screw slowly clockwise to close the scissor-jack platform and lower the top of the scissor-jack platform slowly until the hold-down brackets touch the top of the shipping pallet.

Step 10 Set a blocking plate into the hold-down bracket so that the blank side of the blocking plate is against the heads of the bolts in the side of the scissor-jack platform and the open holes in the blocking plate align with the bolt holes in the top of the pallet.

Step 11 Insert bolts through each of the hold-down bracket holes and into the holes in the top of the shipping pallet, then use the 9/16-inch (14-mm) wrench to tighten the bolts.

Step 12 Turn the scissor-jack screw slowly clockwise to collapse the scissor-jack platform and raise the base of the scissor-jack platform until the weight of the router and scissor-jack platform is absorbed by the pallet. Continue turning the scissor-jack screw clockwise to close the scissor-jack platform and lift the base of the scissor-jack platform until the scissor-jack platform is completely closed (the screw can not be turned).

 

Cisco XR 12416 Router Chassis Installation Guide

A-18

OL-xxxxx-xx

Image 18
Contents Repackaging the Router Router Shipping Package Review Draft Cisco Confidential Figure A-1 Router Shipping Package Components Figure A-2 Router Accessories Package Safety Recommendations Tools and EquipmentPowering Down the Router Removing the Router from the RackDisconnecting Power Cables from the Power Shelf Disconnecting RP CablesDisconnecting Alarm Card Cables Removing the Front CoversRemoving Components from the Chassis to Reduce Weight Removing Power ModulesDetaching the Supplemental Bonding and Grounding Connection Removing the Blower ModulesRemoving the Cards from the Chassis Card Cages Removing the Router from the Equipment Rack Figure A-3 Preparing the Scissor-Jack Platform See Figure A-5 See Figure A-6 Chassis anchor Clip and bolt On each side Installing the Router on the Shipping Pallet Pallet body Pallet front bar Top view of pallet partsReview Draft Cisco Confidential Review Draft Cisco Confidential Reinstalling the Cards in the Switch Fabric Card Cage Reinstalling Components in the RouterReinstalling the Cards in the Upper and Lower Card Cages Reinstalling the Power ModulesRepackaging the Router Accessories Reinstalling the Front CoversRepackaging the Rack-Mounting Platform Repackaging the Vertical Cable-Management Troughs Repackaging the Center-Mount Rack-Mounting BracketsRepackaging the Miscellaneous Accessories Reassembling the Accessories PackageCompleting the Repackaging Repackaging the Replaced Router Chassis Router Replacement Chassis Shipping Container Reinstalling the Replaced Chassis on the Shipping PalletRepackaging the Replaced Chassis for Shipment