Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT — CISCO CONFIDENTIAL

Reinstalling Components in the Router

If you elected to remove components from the chassis before removing it from the rack, you must now reinstall all the components in the chassis.

Reinstalling the Cards in the Upper and Lower Card Cages

Reinstall all of the cards from the upper and lower card cages in their original slots.

Reinstall all of the cards in the upper card cage as instructed in the “Reinstalling the Cards in the Upper Card Cage” section on page 3-52.

Reinstall all of the cards in the lower card cage as instructed in the “Reinstalling the Cards in the Lower Card Cage” section on page 3-53.

Caution Any unoccupied card slot in the upper or lower card cages must have a blank filler panel installed for electromagnetic compatibility (EMC) and to ensure proper air flow through the chassis. When the faceplate of a line card does not completely fill the card slot opening, a narrow card filler panel must be installed for electromagnetic compatibility (EMC) and to ensure proper air flow through the chassis.

Reinstalling the Cards in the Switch Fabric Card Cage

Reinstall all of the cards from the switch fabric card cage in their original slots as instructed in the “Reinstalling the Cards in the Switch Fabric Card Cage” section on page 3-50.

Replacing the Blower Modules

Replace the blower modules as instructed in the “Reinstalling the Blower

Modules” section on page 3-47.

Reinstalling the Power Modules

If you removed AC-input power supplies from the chassis, reinstall each power supply as instructed in the “Installing AC-Input Power Supplies” section on page 3-75.

 

 

Cisco XR 12416 Router Chassis Installation Guide

 

 

 

 

 

 

OL-xxxxx-xx

 

 

A-19

 

 

 

Image 19
Contents Repackaging the Router Router Shipping Package Review Draft Cisco Confidential Figure A-1 Router Shipping Package Components Figure A-2 Router Accessories Package Tools and Equipment Safety RecommendationsRemoving the Router from the Rack Powering Down the RouterRemoving the Front Covers Disconnecting RP CablesDisconnecting Alarm Card Cables Disconnecting Power Cables from the Power ShelfRemoving Power Modules Removing Components from the Chassis to Reduce WeightRemoving the Blower Modules Detaching the Supplemental Bonding and Grounding ConnectionRemoving the Cards from the Chassis Card Cages Removing the Router from the Equipment Rack Figure A-3 Preparing the Scissor-Jack Platform See Figure A-5 See Figure A-6 Chassis anchor Clip and bolt On each side Pallet body Pallet front bar Top view of pallet parts Installing the Router on the Shipping PalletReview Draft Cisco Confidential Review Draft Cisco Confidential Reinstalling the Power Modules Reinstalling Components in the RouterReinstalling the Cards in the Upper and Lower Card Cages Reinstalling the Cards in the Switch Fabric Card CageReinstalling the Front Covers Repackaging the Router AccessoriesRepackaging the Rack-Mounting Platform Repackaging the Center-Mount Rack-Mounting Brackets Repackaging the Vertical Cable-Management TroughsReassembling the Accessories Package Repackaging the Miscellaneous AccessoriesCompleting the Repackaging Repackaging the Replaced Router Chassis Reinstalling the Replaced Chassis on the Shipping Pallet Router Replacement Chassis Shipping ContainerRepackaging the Replaced Chassis for Shipment