Cisco Systems 2654T6, STEV SRT-M-66 appendix Router Replacement Chassis Shipping Container

Page 25

Appendix A Repackaging the Router

Repackaging the Replaced Router Chassis

REVIEW DRAFT — CISCO CONFIDENTIAL

This section contains the following information and procedures:

The Router Replacement Chassis Shipping Container, page A-25

Tools and Equipment, page A-25

Safety Recommendations, page A-25

Reinstalling the Replaced Chassis on the Shipping Pallet, page A-25

Repackaging the Replaced Chassis for Shipment, page A-26

The Router Replacement Chassis Shipping Container

Except for the difference in the foam cushion that sits between the top of the bare chassis, the shipping container for the bare chassis is very similar to the shipping container shown in Figure A-1 on page A-4and described in the “The Router Shipping Package” section on page A-2, earlier in this appendix.

Tools and Equipment

For a list of the items needed to repackage the replaced chassis, refer to the “Tools and Equipment” section on page A-25, earlier in this appendix.

Safety Recommendations

For a summary of the safety information you should review before you begin the procedures in this section, refer to the “Safety Recommendations” section on page A-25, earlier in this appendix.

Reinstalling the Replaced Chassis on the Shipping Pallet

Reinstall the replaced chassis and scissor-jack platform on the shipping pallet as described in the “Installing the Router on the Shipping Pallet” section on page A-16, earlier in this appendix.

 

 

Cisco XR 12416 Router Chassis Installation Guide

 

 

 

 

 

 

OL-xxxxx-xx

 

 

A-25

 

 

 

Image 25
Contents Repackaging the Router Router Shipping Package Review Draft Cisco Confidential Figure A-1 Router Shipping Package Components Figure A-2 Router Accessories Package Tools and Equipment Safety RecommendationsRemoving the Router from the Rack Powering Down the RouterDisconnecting Alarm Card Cables Disconnecting RP CablesDisconnecting Power Cables from the Power Shelf Removing the Front CoversRemoving Power Modules Removing Components from the Chassis to Reduce WeightRemoving the Blower Modules Detaching the Supplemental Bonding and Grounding ConnectionRemoving the Cards from the Chassis Card Cages Removing the Router from the Equipment Rack Figure A-3 Preparing the Scissor-Jack Platform See Figure A-5 See Figure A-6 Chassis anchor Clip and bolt On each side Pallet body Pallet front bar Top view of pallet parts Installing the Router on the Shipping PalletReview Draft Cisco Confidential Review Draft Cisco Confidential Reinstalling the Cards in the Upper and Lower Card Cages Reinstalling Components in the RouterReinstalling the Cards in the Switch Fabric Card Cage Reinstalling the Power ModulesReinstalling the Front Covers Repackaging the Router AccessoriesRepackaging the Rack-Mounting Platform Repackaging the Center-Mount Rack-Mounting Brackets Repackaging the Vertical Cable-Management TroughsReassembling the Accessories Package Repackaging the Miscellaneous AccessoriesCompleting the Repackaging Repackaging the Replaced Router Chassis Reinstalling the Replaced Chassis on the Shipping Pallet Router Replacement Chassis Shipping ContainerRepackaging the Replaced Chassis for Shipment