Cisco Systems STEV SRT-M-66, 2654T6 appendix Repackaging the Miscellaneous Accessories

Page 22

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT — CISCO CONFIDENTIAL

Repackaging the Miscellaneous Accessories

To repackage the all of the miscellaneous accessory pieces, follow these steps:

Step 1 Put the box containing the front cover for the power shelf and upper blower module into the large miscellaneous accessories box.

Step 2 Put all of the other miscellaneous accessory pieces in the box.

Step 3 Close and seal the carton.

Reassembling the Accessories Package

Figure A-2shows an exploded view of the pieces that make up the accessories package for the router. To reassemble the accessory box package, use Figure A-2 on page A-5as a reference and follow these steps:

Step 1 Place the bottom accessories package cap open side up on the floor.

Step 2 To insert the accessory boxes into their slots in the bottom cap, follow these steps:

a.Insert the box containing the center-mount rack-mounting brackets in the center slot closest to the back panel of the router.

b.Set the box containing the rack-mounting platform against the box containing the center-mount rack-mounting brackets.

c.Insert one vertical cable-management trough box on either side of the box containing the rack-mounting platform.

d.Place the miscellaneous accessories box on top of the rack-mounting platform box, between the two trough boxes.

Step 3 Place the top accessories package cap over the ends of the accessories boxes and push it down to hold all the boxes together.

 

Cisco XR 12416 Router Chassis Installation Guide

A-22

OL-xxxxx-xx

Image 22
Contents Repackaging the Router Router Shipping Package Review Draft Cisco Confidential Figure A-1 Router Shipping Package Components Figure A-2 Router Accessories Package Safety Recommendations Tools and EquipmentPowering Down the Router Removing the Router from the RackDisconnecting Power Cables from the Power Shelf Disconnecting RP CablesDisconnecting Alarm Card Cables Removing the Front CoversRemoving Components from the Chassis to Reduce Weight Removing Power ModulesRemoving the Blower Modules Detaching the Supplemental Bonding and Grounding ConnectionRemoving the Cards from the Chassis Card Cages Removing the Router from the Equipment Rack Figure A-3 Preparing the Scissor-Jack Platform See Figure A-5 See Figure A-6 Chassis anchor Clip and bolt On each side Installing the Router on the Shipping Pallet Pallet body Pallet front bar Top view of pallet partsReview Draft Cisco Confidential Review Draft Cisco Confidential Reinstalling the Cards in the Switch Fabric Card Cage Reinstalling Components in the RouterReinstalling the Cards in the Upper and Lower Card Cages Reinstalling the Power ModulesReinstalling the Front Covers Repackaging the Router AccessoriesRepackaging the Rack-Mounting Platform Repackaging the Vertical Cable-Management Troughs Repackaging the Center-Mount Rack-Mounting BracketsRepackaging the Miscellaneous Accessories Reassembling the Accessories PackageCompleting the Repackaging Repackaging the Replaced Router Chassis Router Replacement Chassis Shipping Container Reinstalling the Replaced Chassis on the Shipping PalletRepackaging the Replaced Chassis for Shipment