Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT — CISCO CONFIDENTIAL

Completing the Repackaging

To repackage the router, use Figure A-1 on page A-4as a reference and follow these steps:

Step 1 Verify that the anchor clips fastening the chassis to the scissor-jack platform are installed correctly and that the bolts are tight.

Step 2 Verify that the bolts fastening the hold-down brackets to the sides of the scissor-jack platform and the top of the pallet are tight.

Step 3 Pull the plastic bag over the router to protect it against electrostatic discharge (ESD) and dust.

Step 4 Place the side of the accessories package with the single box containing the center-mount rack-mounting brackets against the back panel of the router on the extended deck of the pallet body.

Step 5 Place the folded corrugated spacer on top of the accessories package, then place the two foam inserts around the top of the router.

Step 6 To install the U-shaped, corrugated side panels, use Figure A-1 on page A-4as a reference and follow these steps:

a.Set the long side of one panel on the pallet base such that it sits inside the bead-boards attached to the outside corners of the pallet riser blocks and against the side of the pallet platform.

b.Set the narrow end flaps of the panel inside the bead-boards attached to the outside corners of the pallet riser blocks.

c.Position the opposite U-shaped side panel such that one narrow end flap is inside the narrow end flap of the first U-shaped side panel, while the other narrow end flap is outside the narrow end flap of the first U-shaped side panel.

Note Because the two U-shaped side panels are identical, interlocking them in this fashion maintains the correct overall container dimensions and strength.

 

 

Cisco XR 12416 Router Chassis Installation Guide

 

 

 

 

 

 

OL-xxxxx-xx

 

 

A-23

 

 

 

Image 23
Contents Repackaging the Router Router Shipping Package Review Draft Cisco Confidential Figure A-1 Router Shipping Package Components Figure A-2 Router Accessories Package Tools and Equipment Safety RecommendationsRemoving the Router from the Rack Powering Down the RouterRemoving the Front Covers Disconnecting RP CablesDisconnecting Alarm Card Cables Disconnecting Power Cables from the Power ShelfRemoving Power Modules Removing Components from the Chassis to Reduce WeightRemoving the Cards from the Chassis Card Cages Detaching the Supplemental Bonding and Grounding ConnectionRemoving the Blower Modules Removing the Router from the Equipment Rack Figure A-3 Preparing the Scissor-Jack Platform See Figure A-5 See Figure A-6 Chassis anchor Clip and bolt On each side Pallet body Pallet front bar Top view of pallet parts Installing the Router on the Shipping PalletReview Draft Cisco Confidential Review Draft Cisco Confidential Reinstalling the Power Modules Reinstalling Components in the RouterReinstalling the Cards in the Upper and Lower Card Cages Reinstalling the Cards in the Switch Fabric Card CageRepackaging the Rack-Mounting Platform Repackaging the Router AccessoriesReinstalling the Front Covers Repackaging the Center-Mount Rack-Mounting Brackets Repackaging the Vertical Cable-Management TroughsReassembling the Accessories Package Repackaging the Miscellaneous AccessoriesCompleting the Repackaging Repackaging the Replaced Router Chassis Reinstalling the Replaced Chassis on the Shipping Pallet Router Replacement Chassis Shipping ContainerRepackaging the Replaced Chassis for Shipment