Cisco Systems 2654T6, STEV SRT-M-66 appendix Removing the Router from the Equipment Rack

Page 11

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT — CISCO CONFIDENTIAL

Removing the Router from the Equipment Rack

This section describes how to remove a fully-loaded router from the equipment rack using the scissor-jack platform. If you elected to empty the chassis before attempting to remove it from the equipment rack, remove the chassis as described in the “Removing and Installing a Chassis” section on page 5-53.

To remove a fully-loaded router from the equipment rack using the scissor-jack platform, follow these steps:

Step 1 Working from the top of the chassis down, remove the screws that secure the chassis to the mounting flanges on the rack (five screws on each side of the chassis).

Step 2 Position the scissor-jack platform in front of the rack-mounting platform installed in the bottom of the rack, with the screw on the scissor-jack platform facing away from the front of the router and the back of the scissor-jack platform butted against the front of the rack-mounting platform.

Step 3 Use the 3/4-in (19-mm) socket and ratchet wrench to turn the scissor-jack screw counterclockwise and expand the scissor-jack platform so that the top of the platform is level with the top of the rack-mounting table under the chassis. (See Figure A-3.)

 

 

Cisco XR 12416 Router Chassis Installation Guide

 

 

 

 

 

 

OL-xxxxx-xx

 

 

A-11

 

 

 

Image 11
Contents Repackaging the Router Router Shipping Package Review Draft Cisco Confidential Figure A-1 Router Shipping Package Components Figure A-2 Router Accessories Package Tools and Equipment Safety RecommendationsRemoving the Router from the Rack Powering Down the RouterRemoving the Front Covers Disconnecting RP CablesDisconnecting Alarm Card Cables Disconnecting Power Cables from the Power ShelfRemoving Power Modules Removing Components from the Chassis to Reduce WeightRemoving the Cards from the Chassis Card Cages Detaching the Supplemental Bonding and Grounding ConnectionRemoving the Blower Modules Removing the Router from the Equipment Rack Figure A-3 Preparing the Scissor-Jack Platform See Figure A-5 See Figure A-6 Chassis anchor Clip and bolt On each side Pallet body Pallet front bar Top view of pallet parts Installing the Router on the Shipping PalletReview Draft Cisco Confidential Review Draft Cisco Confidential Reinstalling the Power Modules Reinstalling Components in the RouterReinstalling the Cards in the Upper and Lower Card Cages Reinstalling the Cards in the Switch Fabric Card CageRepackaging the Rack-Mounting Platform Repackaging the Router AccessoriesReinstalling the Front Covers Repackaging the Center-Mount Rack-Mounting Brackets Repackaging the Vertical Cable-Management TroughsReassembling the Accessories Package Repackaging the Miscellaneous AccessoriesCompleting the Repackaging Repackaging the Replaced Router Chassis Reinstalling the Replaced Chassis on the Shipping Pallet Router Replacement Chassis Shipping ContainerRepackaging the Replaced Chassis for Shipment