Cisco Systems 2654T6, STEV SRT-M-66 appendix Review Draft Cisco Confidential

Page 17

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT — CISCO CONFIDENTIAL

To reinstall the router and scissor-jack platform on the shipping pallet, use

Figure A-7as a reference and follow these steps:

Step 1 Use the hand truck to move the chassis to a level, open space with a solid floor.

Step 2 Tilt the chassis upright so that it stands on the scissor-jack platform, then remove the hand truck.

Step 3 Use the bolts from the original shipping package to attach the eight hold-down brackets to the sides of the scissor-jack platform (two brackets on each side).

Note The hold-down brackets are not symmetrical: The bracket plate that fastens to the side of the scissor-jack platform is narrower than the bracket plate that fastens to the top of the pallet, and has smaller diameter bolt holes.

Step 4 Position the U-shaped pallet body behind the scissor-jack platform with the opening facing the back panel of the router.

Step 5 Use the 3/4-inch (19-mm) socket and ratchet wrench to turn the scissor-jack screw slowly counterclockwise to expand the scissor-jack platform and raise the top of the scissor-jack platform high enough for the hold-down brackets to clear the top of the pallet body.

Step 6 Slide the pallet body around the scissor-jack platform.

Step 7 Slide the pallet front bar into the opening on the pallet body and use the hinge locks to secure it as instructed in these steps:

a.Pivot the butterfly handle on the hinge lock up so that it is perpendicular to the body of the hinge lock.

b.Twist the butterfly handle counterclockwise to extend the hinge lock hook to its maximum reach.

c.Lower the hinge lock hook over the hinge lock catch on the pallet body.

d.Twist the butterfly handle clockwise to clamp the hinge lock hook on the hinge lock catch on the pallet body.

e.Pivot the butterfly lever down onto the hinge lock body so that it lies flat.

 

 

Cisco XR 12416 Router Chassis Installation Guide

 

 

 

 

 

 

OL-xxxxx-xx

 

 

A-17

 

 

 

Image 17
Contents Repackaging the Router Router Shipping Package Review Draft Cisco Confidential Figure A-1 Router Shipping Package Components Figure A-2 Router Accessories Package Tools and Equipment Safety RecommendationsRemoving the Router from the Rack Powering Down the RouterDisconnecting Alarm Card Cables Disconnecting RP CablesDisconnecting Power Cables from the Power Shelf Removing the Front CoversRemoving Power Modules Removing Components from the Chassis to Reduce WeightRemoving the Cards from the Chassis Card Cages Detaching the Supplemental Bonding and Grounding ConnectionRemoving the Blower Modules Removing the Router from the Equipment Rack Figure A-3 Preparing the Scissor-Jack Platform See Figure A-5 See Figure A-6 Chassis anchor Clip and bolt On each side Pallet body Pallet front bar Top view of pallet parts Installing the Router on the Shipping PalletReview Draft Cisco Confidential Review Draft Cisco Confidential Reinstalling the Cards in the Upper and Lower Card Cages Reinstalling Components in the RouterReinstalling the Cards in the Switch Fabric Card Cage Reinstalling the Power ModulesRepackaging the Rack-Mounting Platform Repackaging the Router AccessoriesReinstalling the Front Covers Repackaging the Center-Mount Rack-Mounting Brackets Repackaging the Vertical Cable-Management TroughsReassembling the Accessories Package Repackaging the Miscellaneous AccessoriesCompleting the Repackaging Repackaging the Replaced Router Chassis Reinstalling the Replaced Chassis on the Shipping Pallet Router Replacement Chassis Shipping ContainerRepackaging the Replaced Chassis for Shipment