Cisco Systems 2654T6, STEV SRT-M-66 appendix Repackaging the Vertical Cable-Management Troughs

Page 21

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT — CISCO CONFIDENTIAL

Repackaging the Vertical Cable-Management Troughs

To repackage the vertical cable-management troughs, follow these steps:

Step 1 Place the six screws in a plastic bag.

Step 2 Insert the trough into the long plastic bag.

Step 3 Put the foam cap on each end of the trough.

Step 4 Place the trough and the bag of screws into the corrugated carton.

Step 5 Close and seal the carton.

Step 6 Repeat Step 1 through Step 5 for the second trough.

Repackaging the Center-Mount Rack-Mounting Brackets

If you used the optional center-mount rack-mounting brackets to install the router in the equipment rack, you must repackage the brackets.

To repackage the brackets, follow these steps:

Step 1 Remove the brackets from the rack and place all of the screws in a plastic bag. Step 2 Turn the brackets so the screw rails are interlocked.

Step 3 Hold the brackets together and put the two foam caps on the ends of the brackets. Step 4 Place the brackets and the bag of screws into the corrugated carton.

Step 5 Close and seal the carton.

 

 

Cisco XR 12416 Router Chassis Installation Guide

 

 

 

 

 

 

OL-xxxxx-xx

 

 

A-21

 

 

 

Image 21
Contents Repackaging the Router Router Shipping Package Review Draft Cisco Confidential Figure A-1 Router Shipping Package Components Figure A-2 Router Accessories Package Tools and Equipment Safety RecommendationsRemoving the Router from the Rack Powering Down the RouterDisconnecting Alarm Card Cables Disconnecting RP CablesDisconnecting Power Cables from the Power Shelf Removing the Front CoversRemoving Power Modules Removing Components from the Chassis to Reduce WeightDetaching the Supplemental Bonding and Grounding Connection Removing the Blower ModulesRemoving the Cards from the Chassis Card Cages Removing the Router from the Equipment Rack Figure A-3 Preparing the Scissor-Jack Platform See Figure A-5 See Figure A-6 Chassis anchor Clip and bolt On each side Pallet body Pallet front bar Top view of pallet parts Installing the Router on the Shipping PalletReview Draft Cisco Confidential Review Draft Cisco Confidential Reinstalling the Cards in the Upper and Lower Card Cages Reinstalling Components in the RouterReinstalling the Cards in the Switch Fabric Card Cage Reinstalling the Power ModulesRepackaging the Router Accessories Reinstalling the Front CoversRepackaging the Rack-Mounting Platform Repackaging the Center-Mount Rack-Mounting Brackets Repackaging the Vertical Cable-Management TroughsReassembling the Accessories Package Repackaging the Miscellaneous AccessoriesCompleting the Repackaging Repackaging the Replaced Router Chassis Reinstalling the Replaced Chassis on the Shipping Pallet Router Replacement Chassis Shipping ContainerRepackaging the Replaced Chassis for Shipment